| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 2 | A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 3 | Providing and laying Design Mix concrete for plain/reinforced concrete work in any part of bridge (excluding bottom plugging)with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control,sampling,testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.(b) M-20 Grade Using concrete mixer.(P-332,Item No.-18.07 (b) |
| 4 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. |
| 5 | Hire and labour charges for shuttering with centering and ecessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) Without Staging Drain Base |
| 6 | Hire and labour charges for shuttering with centering and ecessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) With Staging Slab |
| 7 | Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work Prepared Drain |
| 8 | Neat cement punning about 1.5 mm thick in wall,dado window,sill,floor,drain etc |
| 9 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 10 | Incription plate of Sixe 3' X 2' with necessary letter writing. |
| 11 | Post card size photograph. |
| 12 | GST and Labour Cess (9% + 9%) +1% Please Enable Macros to View BoQ information |