| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceablematerials at site and removing rubbish as directed within a lead of 75 m.a) In ground floor including roof. |
| 2 | Dismantling R.C. floor, roof, beams etc. includingcutting rods and removing rubbish as directedwithin a lead of 75 m. including stacking of steelbars. |
| 3 | Pumping out water from ponds or tanks |
| 4 | Bamboo Pile Walling made of 6.5cm to 7.5cm diabamboo (in single line) driven about half-length into ground at very close spacing of...including necessary bamboo,stays,ties, runner etc.Including all complete as per direction.(i) With bamboos of length upto 1.8m and upto 2.4 m.each. |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (Payment to be made on the basis of measurement of finished quantity of work). (c) (i) With carried earth arranged by the contractorwithin a radius of 1 km. including cost of carried earth. |
| 6 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar(b) 15 mm thick plaster |
| 8 | Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. |
| 9 | Filling by silver sand in layers not exceeding 150 mm as directed and consolidating the same by through saturation with water, ramming complete including the cost of supply of sand. |
| 10 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 11 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge-black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m. (i) Tor steel/Mild Steel. (i) In Foundation |
| 12 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). |
| 13 | Ordinary Cement concrete (mix 1:1.5:3) withgraded stone chips (20 mm nominal size)excluding shuttering and reinforcement ifany, in ground floor as per relevant IS codes(i) Pakur Variety(ii) In Ground Floor |
| 14 | Add 18% GST |
| 15 | Add 1% CESS Please Enable Macros to View BoQ information |