| 1 | Supplying Sal-bullah piles at work site, includingdressing and making one end pointed (vi) 225 mm. diameter. |
| 2 | (iii). 150 mm. diameter |
| 3 | Labour for driving Sal-bullah / Eucalyptus bullahpiles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (vi) 225mm diameter |
| 4 | (iii). 150 mm. diameter |
| 5 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage tosite. (b) Width of thinner end above 15 cm.(i) Jhaw / Eucalyptus. |
| 6 | Supplying, fitting and fixing M.S iron shoe to Jhaw / Eucalyptus bullah piles including necessary cleats, nails etc. complete. b) For bullahs above 20 cm & upto 25 cm av. Diameter |
| 7 | Coating of Epoxy resin of thickness not less than 160 micron with a low viscosity, crytallisation resistant epoxy resin base with a reactive diluents combined with high build epoxy amine adducts as per BS 5493 standard and a poly amide or amido poly amine or any suitable hardener it shall react with epoxy resin at normal ambient temperature, suitable for solvent free coating as per recommended proportion for use on metal, concrete and wood surface to protect from corrosion as well as damage from chemical reaction after making the surface free from dust, oil and moisture etc. all complete as per instruction and to be satisfaction of EIC. ( This item will be oprated on prior permission from the concerned SE/Dy. Chief Engineer). |
| 8 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective worksincluding all cost of cost of transportation on road by all means,including other incidental charges complete. |
| 9 | Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per designand placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materialsand equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). |
| 10 | Filling in foundation or plinth by silver sand inlayers not exceeding 150 mm as directed andconsolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand |
| 11 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 12 | Brick-on-edge floor or pavement with 1st class brick set close in cement mortar (1:6) and laid with cushion of sand below (including cost thereof) including ruled or flush pointing with cement mortar (1:4) on top. |
| 13 | By Mix in Place Method : Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber,compacting with vibratory roller to achieve the desired density, including lighting, guarding,barricading, including cost of all materials,machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (v) Grading – V |
| 14 | Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). |
| 15 | 100 mm thick interlocking designer concrete paver block M-50 grade for hightraffic zone, bus terminus, industrial complex, mandi houses etc. as per IS: 15658-2006 (over 20-40 mm medium sand bed on 250mm thk WBM/ WMM base course & 250 mm thk bound gnaular/ granular sub-base course & filling the interstices of blocks with fine sand by brooming & subsequent watering including cost of sand for sand bed but excluding cost of base, sub-base course & subgrade preparation.) complete as per direction of Engineer-in-Charge.[Note: Subgrade CBR shouldnot be less than 5]Grey |
| 16 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another withbracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section,consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. I) For structural members of specified sections weighing less than 22.5 Kg./m |
| 17 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS odes.(i) Pakur Variety |
| 18 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m(i) Tor steel/Mild Steel II. Other thanSAIL/ TATA/RINL |
| 19 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction ofEngineer-In-Charge. |
| 20 | (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 21 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface :With super gloss (hi-gloss) - (iv) Two coats (with any shade except white) |
| 22 | Add GST@18% on Sl. No. 1 to 21 |
| 23 | Add labour cess @1% on Sl. No. 1 to 22 Please Enable Macros to View BoQ information |