| 1 | Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. (Diameter of pile to be measured at a distance of 1.5m from the thicker end.) (v) 200mm diameter |
| 2 | Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. (Diameter of pile to be measured at a distance of 1.5m from the thicker end.) (i) 100mm diameter |
| 3 | Coal tarring on wooden surfaces including cost of materials. (a) Double coat. |
| 4 | Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (v) 200mm diameter |
| 5 | Labour for fitting and fixing 10cm. to 13cm. Diameter sal-bullah as ties and runners including necessary nails, bolts and nuts. |
| 6 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.24.Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 7 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.27.Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/bag |
| 8 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELS AND OTHER FLOOD PROTECTIVE MEASURES 2.29.Dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts. |
| 9 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). |
| 10 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) |
| 11 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. |
| 12 | Estimated amount |
| 13 | Add: 9%SGST |
| 14 | Add: 9%CGST |
| 15 | 1% LWC Please Enable Macros to View BoQ information |