| 1 | Part 1: Providing New Borewell with Errection of Motor and Pipeline, Sintex tank in Community hall Near Bus stop at Pappampatty H/O PappampattyEstimate Amount: Rs.5.60 Lakhs |
| 2 | Geophysical survey charges |
| 3 | Drilling of 180mm dia vertical borewell in Loose soil area as per the recommentation of hydrogeologist including the rig transportation inserting of casing pipe and flushing etc.., complete |
| 4 | Drilling of 150mm dia vertical borewell in hard rock area as per the recommentation of hydrogeologist including the rig transportation inserting of casing pipe and flushing etc.., complete |
| 5 | Supply of 180mm PVC pipe 6kg/sqcm |
| 6 | Supply and delivery of 7.50 HP Motor Submergible pumpset with panel board having duty of 50LPM X 225 meters head with ISI Make (81572+21187) |
| 7 | 40mm UPVC Pipe |
| 8 | 40mm GI Bend |
| 9 | MS Clampset |
| 10 | 4.00 sqmm Cable |
| 11 | 25mm PVC Pipe (super thick) for cable encasing |
| 12 | 25mm PVC Elbow |
| 13 | 160mm dia MS Borwell Cover |
| 14 | 63mm PVC Pipe |
| 15 | 63mm PVC Bend |
| 16 | 63mm PVC Elbow |
| 17 | Solvent Cement |
| 18 | Erection of submergible Pumpset into borewell including fixing and jointing cable with proper clamps into the level to required depth and also fixing the riser pipe to required depth, panel board fitting, valve fitting and control equipment fitting, twin earth providing for I.E.rule and testing trail running complete. |
| 19 | Construction of EB service chamber in Brick masonry, Plastering, RCC roof including supply, deliver and fixing of MS Door and frame set with lock and key arrangements. |
| 20 | Labour charges for providing of EB service main arrangement from EB post to pump room and fitting service pipe EB board wiring complete including 7/20 PVC overhead wiring main, fuse unit, GI wire and all materials fixing complete. |
| 21 | Supply and delivery of 1000 lit capacity HDPE Tank |
| 22 | Construction of Pedestal for HDPE Tank in brick masonry as per approved design |
| 23 | Providing Inlet and Outlet connection to the HDPE Tank |
| 24 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete |
| 25 | a) For Water line |
| 26 | b) For Cable line |
| 27 | EB Deposit amount charges |
| 28 | Name board charges |
| 29 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} |
| 30 | Part 2: Providing New Borewell with Errection of Motor and Pipeline, Sintex tank in SKC nagar at Pappampatty H/O PappampattyEstimate Amount: Rs.5.00 Lakhs |
| 31 | Geophysical survey charges |
| 32 | Drilling of 180mm dia vertical borewell in Loose soil area as per the recommentation of hydrogeologist including the rig transportation inserting of casing pipe and flushing etc.., complete |
| 33 | Drilling of 150mm dia vertical borewell in hard rock area as per the recommentation of hydrogeologist including the rig transportation inserting of casing pipe and flushing etc.., complete |
| 34 | Supply of 180mm PVC pipe 6kg/sqcm |
| 35 | Supply and delivery of 7.50 HP Motor Submergible pumpset with panel board having duty of 50LPM X 225 meters head with ISI Make (81572+21187) |
| 36 | 40mm UPVC Pipe |
| 37 | 40mm GI Bend |
| 38 | MS Clampset |
| 39 | 4.00 sqmm Cable |
| 40 | 25mm PVC Pipe (super thick) for cable encasing |
| 41 | 25mm PVC Elbow |
| 42 | 160mm dia MS Borwell Cover |
| 43 | 63mm PVC Pipe |
| 44 | 63mm PVC Bend |
| 45 | 63mm PVC Elbow |
| 46 | Solvent Cement |
| 47 | Erection of submergible Pumpset into borewell including fixing and jointing cable with proper clamps into the level to required depth and also fixing the riser pipe to required depth, panel board fitting, valve fitting and control equipment fitting, twin earth providing for I.E.rule and testing trail running complete. |
| 48 | Construction of EB service chamber in Brick masonry, Plastering, RCC roof including supply, deliver and fixing of MS Door and frame set with lock and key arrangements. |
| 49 | Labour charges for providing of EB service main arrangement from EB post to pump room and fitting service pipe EB board wiring complete including 7/20 PVC overhead wiring main, fuse unit, GI wire and all materials fixing complete. |
| 50 | Supply and delivery of 1000 lit capacity HDPE Tank |
| 51 | Construction of Pedestal for HDPE Tank in brick masonry as per approved design |
| 52 | Providing Inlet and Outlet connection to the HDPE Tank |
| 53 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete |
| 54 | a) For Water line |
| 55 | b) For Cable line |
| 56 | EB Deposit amount charges |
| 57 | Name board charges |
| 58 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} |
| 59 | Part 3: Providing Pipeline From Ellai karuppanasamy kovil to North Erumaiparai at Pappampatty H/O PappampattyEstimate Amount: Rs.4.95 lakhs |
| 60 | 63mm PVC Pipe |
| 61 | 63mm PVC Elbow |
| 62 | 63mm PVC Bend |
| 63 | 63mm PVC Gate valave |
| 64 | Solvent cement |
| 65 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete For Water line |
| 66 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |