| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. |
| 2 | Supply and filling with M sand for foundation and basement to required thickness and in layers of not more than 15cm thick, watered, well rammed and consolidated etc.., complete as directed by the Federation Officers and as per standard specifications |
| 3 | Plain Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers |
| 4 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 5 | Providing and laying in position, Standardised Concrete Mix M-25 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350 kglm3 and maximum water cement ratio of 0.50, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m') 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including Conveyance of concrete from batching plant to Work site, Electricity charges and other works & labour cost involved for concrete production, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards including centering works . (No separate payment will be made by the Department for the excess usage of materials)- For Foundation and Basement |
| 6 | Above basement upto 4.50m ht. |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) |
| 8 | Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 1/2” x 3” with class designation of 10 conforming to IS 1077-1992 for oundation and basement including Cost of Mortar Plasticizer curing, etc.,complete mplying with standard specification and as directed by the departmental officers. ickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge - for foundation and basement . |
| 9 | Above basement upto 4.50m ht. |
| 10 | supplying and fabricating in position of structural steel work (MS angle, channel , plates) cost including welding and cutting,/bolts and nuts including one coat of red oxide priming coat , new iron painting for all works etc complete |
| 11 | Supplying , fixing and roofing with colour galvalume sheet of 0.47mm thick with all necessary accessories such as J/V bolt and nuts of suitable length with suitable bitumen washers complete complying with standard specification and as directed by the departmental officers. |
| 12 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 13 | Plastering with Cement Mortar 1:3 (One cement and three Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 14 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 15 | GST (Note: The tenderer should quote the amount towards Goods and Service tax (GST) in the appropriate columns in terms of percentage (%). If not quoted, it will be considered that the rate quoted is inclusive of GST.) Please Enable Macros to View BoQ information |