|
| 1 | Part 1: Providing Pipline From Gandhi rajan house to Nalla thambi house in Mettukadu at Kanakkanpatty Panchayat (60 FHTC)Estimate Amount: Rs.5,00,000/- |
| 2 | Dismantling and removing the damage P.C.C concrete portion including all labour charges and all other incidental charges etc., complete. |
| 3 | 63mm PVC Pipe |
| 4 | 63mm PVC Bend |
| 5 | 63mm PVC Elbow |
| 6 | 63mm PVC Gate valave |
| 7 | Solvent cement |
| 8 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete For Water line |
| 9 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 10 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 11 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 12 | Supply of 20mm GI B Class Pipe |
| 13 | Supply of 20mm GI Coupling |
| 14 | Supply of 20mm Brass tap |
| 15 | Supply of 20mm GI Elbow |
| 16 | Labour Chargers for 20mm dia GI pipe Cutting |
| 17 | Labour Chargers for 20mm dia GI pipe threading |
| 18 | Supply of 20mm dia GM Flow control valve |
| 19 | Supply of 20mm dia Brass ferrule |
| 20 | Supply of 20mm dia PVC pipe 10kg/sq.cm |
| 21 | Supply of 20mm dia PVC MTA/FTA |
| 22 | Supply of 20mm dia PVC Bend |
| 23 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete For FHTC |
| 24 | Laying of G.I. Pipes and specials to proper line and level including jointing but excluding cost of pipes and jointing materials for plumbing works for providing water supply and sanitary works in the premises of the street as per standared specifications etc., (6 mm to 32 mm dia) |
| 25 | Provision for Name board charges |
| 26 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} |
| 27 | Part 2: Providing Pipline with FHTC in Rajapuram pudhur H/O Kanakkanpatty (75 FHTC)Estimate Amount: Rs.5,00,000/- |
| 28 | Dismantling and removing the damage P.C.C concrete portion including all labour charges and all other incidental charges etc., complete. |
| 29 | 63mm PVC Pipe |
| 30 | 63mm PVC Bend |
| 31 | 63mm PVC Elbow |
| 32 | 63mm PVC Gate valave |
| 33 | Solvent cement |
| 34 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete For Water line |
| 35 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 36 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. |
| 37 | Supply of 63mm x 20mm dia PVC Saddle piece |
| 38 | Supply of 20mm GI B Class Pipe |
| 39 | Supply of 20mm GI Coupling |
| 40 | Supply of 20mm Brass tap |
| 41 | Supply of 20mm GI Elbow |
| 42 | Labour Chargers for 20mm dia GI pipe Cutting |
| 43 | Labour Chargers for 20mm dia GI pipe threading |
| 44 | Supply of 20mm dia GM Flow control valve |
| 45 | Supply of 20mm dia Brass ferrule |
| 46 | Supply of 20mm dia PVC pipe 10kg/sq.cm |
| 47 | Supply of 20mm dia PVC MTA/FTA |
| 48 | Supply of 20mm dia PVC Bend |
| 49 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete For FHTC |
| 50 | Laying of G.I. Pipes and specials to proper line and level including jointing but excluding cost of pipes and jointing materials for plumbing works for providing water supply and sanitary works in the premises of the street as per standared specifications etc., (6 mm to 32 mm dia) |
| 51 | Provision for Name board charges |
| 52 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} |
| 53 | Part 3: Providing New Borewell with Errection of Motor and Pipeline at Kanakkanpatty H/O KanakkanpattyEstimate Amount: Rs.4,00,000/- |
| 54 | Geophysical survey charges |
| 55 | Drilling of 180mm dia vertical borewell in Loose soil area as per the recommentation of hydrogeologist including the rig transportation inserting of casing pipe and flushing etc.., complete |
| 56 | Drilling of 150mm dia vertical borewell in hard rock area as per the recommentation of hydrogeologist including the rig transportation inserting of casing pipe and flushing etc.., complete |
| 57 | Supply of 180mm PVC pipe 6kg/sqcm |
| 58 | Supply and delivery of 5HP Motor Submergible pumpset with panel board having duty of 50LPM X 175 meters head with ISI Make (68354+16810) |
| 59 | 40mm UPVC Pipe |
| 60 | 40mm GI Bend |
| 61 | MS Clampset |
| 62 | 4.00 sqmm Cable |
| 63 | 25mm PVC Pipe (super thick) for cable encasing |
| 64 | 25mm PVC Elbow |
| 65 | 160mm dia MS Borwell Cover |
| 66 | 63mm PVC Pipe |
| 67 | 63mm PVC Bend |
| 68 | 63mm PVC Elbow |
| 69 | Solvent Cement |
| 70 | Erection of submergible Pumpset into borewell including fixing and jointing cable with proper clamps into the level to required depth and also fixing the riser pipe to required depth, panel board fitting, valve fitting and control equipment fitting, twin earth providing for I.E.rule and testing trail running complete. |
| 71 | Construction of EB service chamber in Brick masonry, Plastering, RCC roof including supply, deliver and fixing of MS Door and frame set with lock and key arrangements. |
| 72 | Labour charges for providing of EB service main arrangement from EB post to pump room and fitting service pipe EB board wiring complete including 7/20 PVC overhead wiring main, fuse unit, GI wire and all materials fixing complete. |
| 73 | Earthwork excavation in hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils etc.., complete |
| 74 | a) For Water line |
| 75 | b) For Cable line |
| 76 | EB Deposit amount charges |
| 77 | Name board charges |
| 78 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |