| 1 | Maintenance of Storm water drain |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 3 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) |
| 4 | Providing steel centering for sides and soffits including supports and strutting upto 1:10/1:20 up to 3.29m height for plain surfaces such as RCC slabs, rectangular beams, Tee beams, bed blocks, Culvert body walls, deck slabs, retaining walls, staircase, Landing slab, landing beams, canopy etc., wood) joists of size 10cmx 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 15cm c/c including cost of nails, ropes, all labour charges and incidental charges etc. complete complying with standard specification.(TNBP Spl. No.154 A) |
| 5 | Plain Cement Concrete 1:3:6 (one cement, Three Crushed Stone Sand (M- Sand) and Six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 6 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC 1:2:4 (one cement, two crushed stone sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers.75 mm thick |
| 7 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. |
| 8 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) Please Enable Macros to View BoQ information |