| 1 | Geophysical survey charges Drilling of Borewell in Alluvial soil starta of clay and sand stone, shale, pebbles, boulders etc., by first taking and pilot bore of 140mm/150mm/200mm dia and then enlarging to required dia by direct or reverse rotary mud circulation method, using contractor's ridg fuel labour drilling at the site shown by the Department Officers including construction of mud pit and transportation (Water available within a lead of 1.5K.M) using Rotary Rig. |
| 2 | Upto 60m.Depth ending below Ground Level |
| 3 | From 60m and upto 90m depth ending from G.L. |
| 4 | From 90m and upto 120m depth ending from G.L. |
| 5 | From 120m and upto 150m depth ending from G.L. |
| 6 | From 150m and upto 180m depth ending from G.L. |
| 7 | From 180m and upto 210m depth ending from G.L. |
| 8 | Reaming 140/150mm Diameter Bore to 300 mm Diameter Below Ground Level From 0Mts and Upto 60m.Depth ending below Ground Level |
| 9 | From 60m and upto 90m depth ending from G.L. |
| 10 | From 90m and upto 120m depth ending from G.L. |
| 11 | From 120m and upto 150m depth ending from G.L. |
| 12 | From 150m and upto 180m depth ending from G.L. |
| 13 | From 180m and upto 210m depth ending from G.L. |
| 14 | Reaming 300mm Diameter Bore to 400 mm Diameter Below Ground Level From 0Mts and Upto 60m.Depth ending below Ground Level |
| 15 | From 60m and upto 90m depth ending from G.L. |
| 16 | From 90m and upto 120m depth ending from G.L. |
| 17 | From 120m and upto 150m depth ending from G.L. |
| 18 | From 150m and upto 180m depth ending from G.L. |
| 19 | From 180m and upto 210m depth ending from G.L. |
| 20 | Electrical Logging Charges for borewell |
| 21 | Supply and delivery of the following materials required for the erection of borewell 200 mm dia OD PVC plain casing pipe CS PIPE |
| 22 | 201 mm dia OD pvc Plain casing pipes CM PIPE |
| 23 | 201 mm dia OD PVC plain casing pipe CM PIPE |
| 24 | 200 mm dia OD pvc ribbed screen casing pipes |
| 25 | 200mm dia Bottom Dummy (Pre end cap) |
| 26 | Bore Well Top Cover |
| 27 | Labour charges for inserting PVC Casing pipes assembly (with slots or without slots) in the drilled hole including jointing the pipes, supplying and packing the annular space with pebbles of size and quality as approved by the Department Officer. 200mm OD PVC Pipe |
| 28 | Charges for developing the borewells with air compressor of 600 CFM capacity (minimum 8 hours) including transportation labour and fuel charges for compressor as direct by Departmental Officers conducting yield test \\"V\\" Notach method |
| 29 | Supply and delivery of submersible pump set 100LMP X 175M Head |
| 30 | 20A-35A Star delta starter panel Board |
| 31 | 4 sq.mm 3 core submersible cable |
| 32 | 63mm OD HDPE HOSE - 10Ksc |
| 33 | 50mm dia SS Nipple |
| 34 | 50mm dia MS Clamp sets |
| 35 | 50mm dia GI Flange |
| 36 | 50mm dia Flange Leather |
| 37 | 100Ams fuse unit |
| 38 | Labour charges for errection of submersible pump set including cable jointing fixing of starter, fuse unit and all other accessories etc., complete. Above 5 to 10HP |
| 39 | Provide LFW 1% Please Enable Macros to View BoQ information |