| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto1000m Morth_301 |
| 2 | Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. Morth 305 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | Construction of dry lean cement concrete (DLC) Sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS : 383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 1 : 1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 Kg/Cum, optimum moisture content to be determined during trial length constructioin, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. |
| 5 | Construction of Thin White Topping/Cement Concrete Pavement with plain cement concrete pavement over existing surface with approve grade cement @ 400 kg per cum and as per IRC SP-76, coarse and fine aggregate conforming to IS 383, maximum size of fine aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction joint, joint filler, sealant primer, joint sealant, admixtures as approved, curing compound, finishing to lines etc.. and grades as per drawingMorth 6.6 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. DSR 13.62.1 |
| 7 | Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. |
| 8 | Brick masonry in 1:4 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 |
| 9 | Plain cement concrete 1:3:6 nominal mix in foundation Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203days. MORD-11.4(i) |
| 10 | Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. As Per MoRT&H 14.06 Or 14.07 Please Enable Macros to View BoQ information |