| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST.(Carted Earth). |
| 3 | Providing and laying filter material underneath Pitching in slopes compelete as per drawing and Technical Specifications. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST.(Ref. to Morth 2504 /Sr. No 16.05) |
| 4 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 5 | PCC (1Cement:3Coarse sand :6 Stone grit) using batching plant transit mixer & Manual placing in foundation as per drawing and technical specifications. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 6 | Plain/Reinforced cement concrete RCC Grade M20 in open foundation complete as per drawing and technical specifications. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 7 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. . Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 8 | Providing and Laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment compelete as per drawing and Technical Specifications. (Ref. to Morth 2504 /Sr. No 16.04) Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 9 | Cast in Situ Cement Concrete M 20 Kerb with Channel Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M15 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 10 | Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 11 | Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 12 | Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specification Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. |
| 13 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. Including cost of, all material, labour, T&P, all taxes and labour cess complete. But excluding GST. Please Enable Macros to View BoQ information |