| 1 | Earth work of silt clearance of channels and drainskassi work undressed involving an average horizontal throw up to 2 metres and average verticle lift up to 0.5metres |
| 2 | Dismantleing concrete Cement concrete plain 1:4:8 or 1:5:10 |
| 3 | Reinforced cement concrete |
| 4 | Taking out existing CC interlocking paver blocks from footpath/ central verge/pavement, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in- Charge |
| 5 | Reinforced cement concrete M-20mechanically batchmixed using batch typeconcretemixerasperIS:1791andvibratedbyneedle vibrator but excluding steelreinforcement centring and shuttering infoundation and plinth. |
| 6 | First class burnt brick work laid in cement sand mortar 1:5 in first storey upto 4 metres plinth level |
| 7 | relaying 60 mm thick factory made cement concrete interlocking paver block of M-35 grade machine made rubber moulded smooth finish with strong vibratory process or with vibro- hydraulic compaction machine and of approved size and design / shape laid in Ordinary Grey and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-in-Charge IS Code: 15658(2006) for non traffic areas and streets having width less than 3.05 mt (also not to used over footpaths) |
| 8 | Providing & fixing 560 mm, 500 mm and 450 mm internal diametre circular or 450 mm x 600 mm clear inside opening rectangular RCC manhole cover and frame ISI marked as per IS:12592-2002 including carriage from the stores of the Engineer-in-charge to site of work, loading, unloading including stacking and setting the same to correct lines over manholes including cement concrete copping (M:20) around the frame etc. Dia of steel for lifting hook is 16mm. (for EHD and HD). RCC Man hole cover with Frame 560mm i/d RCC man hole cover withframe as per ISI Heavy duty |
| 9 | Providing, laying in trenches to correct gradient and alignment and jointing of UPVC pipes having ISI specification IS:15328-2003 class-SN-8 marked make Supreme, Finolex, Kissan, Jain, Prince or equivalent good on them and laying the same in trenches to correct alignment and gradients, cutting and jointing, testing for water tightness and making good the leakages and defects including cost of specials (Specials and Solvent should be of same make as that of pipes) complete in all respects. 160mm o/d pipe |
| 10 | Providing, laying in trenches to correct gradient and alignment and jointing of UPVC pipes having ISI specification IS:15328-2003 class-SN-8 marked make Supreme, Finolex, Kissan, Jain, Prince or equivalent good on them and laying the same in trenches to correct alignment and gradients, cutting and jointing, testing for water tightness and making good the leakages and defects including cost of specials (Specials and Solvent should be of same make as that of pipes) complete in all respects. 200mm o/d pipe |
| 11 | constructing brick masonry road gully chambers as per standard drawings (as per sizes given below) including dressing of beds and sides of chambers to exact profiles, 15cm thick C.C 1:6:12 in foundation, first classbrick work laid in cement sand mortar 1:5 40mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of1.5mm thick neat cement laid in one operationto the topping, the entire inner surface of thechamber rendered with neat cement not lessthan 12.50mm in thickness of 1:2 cementsand plaster and finished with a floating coatof neat cement 1mm thick left absolutelysmooth polished and correct to templateincluding cost of precasted RCC road gullygrating and frame including paint with coal tar(as specified in item No. 29.49) complete andto the requirement of the Engineer-In-Charge.Single Road Gully chamber |
| 12 | laoding and unloading by mechanical meansstone (buildings, pr pitching) sand, earth, fly, ash, bajri, shingle, spalls, brick bats, brick ballast and stone metals |
| 13 | carriage 5.2Earth, surkhi, sand, earth, fly, ash, bajri, ballast, stone boulders, kankar and building rubbish., earth 5.0 km |
| 14 | Raising of manhole |
| 15 | P/L 1:4:8 with 40mm stone ballast include carriage Please Enable Macros to View BoQ information |