| 1 | Taking out existing CC interlocking paver blocks from footpath/ central verge/pavement,including removal of rubbish etc., disposal ofunserviceable material to the dumping ground,for which payment shall be made separatelyand stacking of serviceable material within 50metre lead as per direction ofEngineer-in-Charge. |
| 2 | Excavation of trenches in a Streets, Lanes or in Open Area for Storm Sewers and Manholes to Full Depths as Shown in Drawings,excluding Shoring, Timbering of Poling Board Frame System Type, dressing to correct sections and dewatering, provision for diversion for traffic, protection of existing services i.e. telephone cables ,electric lines, water supply lines and gas lines.night signals, profiles, Pegs, Sight rails, boning rods, crossing over trenches for access to the houses, watching, fencing etc., fixing and maintenance of caution boards, refilling trenches, watering of refill in 15 cm layers, ramming and restoration of surface to original conditions and removal of Surplus Spoil from the Site of Works, for all Works other than connections to Ventilating Shafts upto a Lead of 15 mtrFor depth not exceeding 2 m below Groundleve All classes of soil except rocky |
| 3 | Providing, laying in trenches to correctgradient and alignment and jointing of UPVCpipes having ISI specification IS:15328-2003class-SN-8 marked make Supreme, Finolex,Kissan, Jain, Prince or equivalent good onthem and laying the same in trenches tocorrect alignment and gradients, cutting andjointing, testing for water tightness andmaking good the leakages and defectsincluding cost of specials (Specials and Solventshould be of same make as that of pipes)complete in all respects.200mm o/d pipe |
| 4 | Constructing brick masonry manhole incement mortar 1:5 ( 1 cement : 5 coarsesand ) R.C.C. top slab 20cm thick using M-20mix by using mixer and vibrator, TMT Fe500@ 80.00 kg/per cum, foundation concrete1:4:8 mix (1 cement: 4 coarse sand : 8graded stone aggregate 40mm nominal size)inside plastering 12mm thick with cementmortar 1:3 (1 cement: 3 coarse sand) finishedwith floating coat of neat cement and making40mm thick benching in cement concrete1:2:4 (1 cement : 2 coarse sand : 4 gradedstone aggregate 20mm nominal size) finishedwith a floating coat of neat cement, Orangecoloured PVC steps including RCC cover withframe complete as per standard designcomplete in all respectsInside size 75x120 cm and 120 cm deep |
| 5 | Extra payable for every 0.30 m additionaldepth of manhole chamber in item 29.55 upto1.80 m increase in depth Inside size 75x120 cm |
| 6 | Construction of brick masonry inspectionchambers size as given below upto 0.60 metreaverage depth in 1:5 cement sand mortar,C.C.1:4:8 ( 150mm thick) in foundation,cement concrete 1:2:4 benching 12.50mmthick cement plaster 1:2 with a floating coat of1mm thick of neat cement, R.C.C. 1:2:4 slabs100mm thick cement concrete topping 50mmthick with 455mm x 455mm, 455mm x610mm inside R.C.C. inspection chambercover and frame (Weight as per I.S.Ispecifications) painted with 3 coats of blackbitumastic paint conforming to I.S.I completeas per standard design 600mm x 900mm inside with 455mm x 455mm cover and frame light duty double seal |
| 7 | Extra for every 0.30 metre depth of inspectionchamber 600mm x 900mm inside |
| 8 | Dismantling of old S.W. pipes includingbreaking of joints and bed concrete stacking ofuseful materials and disposal of unserviceablematerials within 100 m as desired byEngineer-in-Charge 150 mm Diametre |
| 9 | Disilting of manhole including all safetymeasures, cost of container T & P and disposalof silt upto 5km complete in all respects. Depth upto 3 m |
| 10 | Making connection of newly laid sewer in wallsof existing manhole of fully charge sewerincluding cost of pluging sewer, desilting,removal of sullage water and making good ofkhudda Sewer connections upto 300 mm id |
| 11 | SEWER CONNECTION REPAIR |
| 12 | WATER SUPPLY CONNECTION |
| 13 | Making dewatering arrangement by pumping set 4 *4 (Tractor driven) |
| 14 | LOADING AND UNLOADING By Mechanical Means Stone (building or pitching) Sand, Earth, FlyAsh, Bajri, Shingle, Spalls, Brick bats, Brickballast and Stone metal Please Enable Macros to View BoQ information |