| 1 | Excavation in earth work in foundation and trenches etcetera in all kind and classification of soil such as pick work, jumper work, pick jumper work, blasting work and hard blasting work and saturated soil any other mixed verity of soil in dry or saturated condition upto any depth and lift upto any height including chiseling/wedging out rocks where blasting prohibited dewatering pumping or bailing out water where required and/ removal of slush seprately as directed which may arise during the execution including stacking the serviceable and unserviceable material and then returning stacked soil in any thickness of layers when required into plinth side of foundation etcetera consolidating each deposited layers by ramming and watering then disposing of all surplus unserviceable excavated earth as specified dumping place as per CPWD specifications 2019 complete and direction of Engineer-in- charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi , royality , Malkhana , toll tax, goods service tax , labour cess or other taxes imposed by the Govt. |
| 2 | Construction of granular sub-base by providing well graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site upto lead of 1000m spreading in uniform layers with motor grader on prepared surface and compacting with smooth wheel roller to achieve the desired density, complete for grading-1 material as as per CPWD specifications 2019 complete and direction of Engineer-in- charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi , royality , Malkhana , toll tax, goods service tax , labour cess or other taxes imposed by the Govt. |
| 3 | Proviidng and laying , spreading and compacting graded stone aggregate (size range 53 tem to 0.075 mm) to wet mix macadam (WMM)specification including premixing the material with water at OMC in for all leads and lifts, laying in uniform layers with mechanical paverfinisher in sub-base hase course on well prepared surface and compacting with vibratory roller of 8 (eight) to 10 (ten) tonne capacity to achievethe desired density, complete as per CPWD specifications 2019 complete and direction of Engineer-in- charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government |
| 4 | Providing and applying tack coat with RS-I setting bitumen emulsion on WBM/WMM @ 0.40kg/sqm (at the rate of zero point four zero kilogram per square meter) using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical brooms per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. |
| 5 | Providing and applying tack coat with RS-I setting bitumen emulsion on bituminous surface @ 0.25kg/sqm (at the rate of zero point two five kilogram per square meter) using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical brooms as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. |
| 6 | 2 cm (two centimeter) premix carpet surfacing with 1.8 cum (one point eight cubic meter) and 0.90 cum (zero point nine zero cubic meter of stone chippings of 13.2 mm (thirteen point two millimeter) size and 11.2 mm (elevel point two millimeter) size respectively per 100 sqm (one hundred square meter) and 52 kg (fifty two kilogram) and 56 kg (fifty six kilogram) of hot bitumen per cum of stone chippings of 13.2 mm (thirteen point two millimeter) and 11.2 mm (eleven point two millimeter) size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 (six) to 9(nine) tonne capacity etc. complete (tack coat to be paid for separately) with paving Asphalt grade VG - 30 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt as per CPWD specification 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. |
| 7 | Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg (one hundred twenty eighty kilogram)of bitumen of grade VG - 30 bitumen per cum of fine aggregate and 0.60 cum (zero point six zero cubic meter) of fine aggregate per 100 sqm (one hundred square meter) of road surface, including rolling and finishing with road roller all complete as per CPWD specification 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. |
| 8 | Providing and laying in position cement concrete 1:3:6 (one cement : three sand: six graded/crushed stone aggregate 20 mm (twenty millimeter) nominal size mechanically mixed and curing complete including cost of centring and shuttering in Retaining wall / Breast wall as per CPWD specifications 2019 complete and direction of Engineer-in- charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi , royality , Malkhana , toll tax, goods service tax , labour cess or other taxes imposed by the Govt. Please Enable Macros to View BoQ information |