| 1 | Electrical Works |
| 2 | CABLING AND ALLIED WORKS - ARMOURED CABLES Supply & laying of XLPE insulated PVC sheathed aluminium/copper conductor, 1.1 kV grade armoured cable conforming to IS:7098, as per approved make in ground/ trench/surface/pipe, etc. whereever required as per direction of Engineer In-charge. Note: The rate of Installation should be inclusive of Cable clamps, tags Saddles, Consumables etc. Trays/pipes, trenches, fabricated tray supports etc will be covered & paid in Separate Items |
| 3 | 3.5 Core x 120 sq. mm Aluminium Cable FRLS |
| 4 | 3 Core x 2.5 sq. mm Copper Cable FRLS (For Voltmeter) |
| 5 | 6 Core x 2.5 sqmm Copper Cable FRLS |
| 6 | FLP HEAVY DUTY DOUBLE COMPRESSION Cable Termination(FLP):Providing termination of 1.1 kV grade armoured cable for the following sizes including supply of FLP heavy duty double compression cable glands, Baliga/CEAG-FCG /Flexpro/ FEPL make, crimping lugs and allied jointing materials, etc. all complete as per specification & direction of Engineer In-charge. Copper lugs for copper cables and aluminium lugs for aluminium cables shall be used. |
| 7 | 3.5 Core x 120 sq. mm |
| 8 | 3 Core x 2.5 sq. mm |
| 9 | 6 Core x 2.5 sq.mm |
| 10 | CABLE TERMINATION GLANDS NON-FLP HEAVY DUTY DOUBLE COMPRESSION Cable Termination (NON FLP): Providing termination of 1.1 kV grade armoured cable for the following sizes including supply of NON FLP heavy duty Double Compresson cable glands, crimping type lugs and allied jointing materials, etc. all complete as per specification and direction of Engineer In-charge. Glands and lugs shall be of approved make. Copper lugs for copper cables and aluminium lugs for aluminium cables shall be used. |
| 11 | 3.5 Core x 120 sq. mm |
| 12 | 3 Core x 2.5 sq. mm |
| 13 | 6 Core x 2.5 sq.mm |
| 14 | Testing and commissioning of 415 V Motors of the following flameproof type and rating, checking of direction of rotation, changing the same if required, trail run on “No Load” and “ON Load” as per direction of the site-in-charge, keeping proper record of testing at “NO Load” and “On Load”. |
| 15 | Rating from 45 KW |
| 16 | Modification of Motor Single Line Diagram to Include the new motor and printing of the same |
| 17 | Supply and Installation of Flow Switch on the outlet of the water line |
| 18 | Supply and Installation of Instrinsically safe pressure transmitors |
| 19 | Range (1-10kg/m2) |
| 20 | Range (1-20kg/m2) |
| 21 | Communication cable |
| 22 | Supply of instr. cable 1 Pair x 0.5 Sqmm |
| 23 | Supply of instr. cable 10Pair x 0.5 Sqmm |
| 24 | Laying of 1 Pair x 0.5 Sqmm Instr Cable |
| 25 | Laying of 10 Pair x 0.5 Sqmm Instr Cable |
| 26 | Supply, Installation, erection, testing, sucessful commissioing of different kind of INSTRUMENT, LCS & JBs as per tender specification and required at site. |
| 27 | Flame Proof, Weather Proof JUNCTION BOX with 80 Terminals with canopy |
| 28 | Earthing Works |
| 29 | Supply, Laying and termination of 1C*35SQMM earthing cable (Green Color) |
| 30 | Supply and installation of hot dip galvanized GI earth bus (Galvanizing 900 gm/M²) (50X10MM) |
| 31 | Supply & drawing/laying, jointing, connecting, testing and commissioning of earth strip/copper strip/GI wire for earthing and lightning protection under or aboveground complete as per specification for the following : |
| 32 | 50mmX 6mm GI (Earthpits to Earth bus) |
| 33 | 35 x 6 mm G.I.strip (Earth bus to Motor) |
| 34 | ii) Providing earthing with 80 mm dia,3.0 M long GI (Heavy duty) perforated pipe as per IS:3043 (with latest ammendment) including providing suitable earth bus for interconnection, providing a mixture of salt & charcoal, making earth pit chamber with chequered plate cover as per standard Drwng. etc. all complete as per specif. & direction of Engineer-In-charge |
| 35 | Mechanical Works |
| 36 | Supply of Pipes, pipe fittings, flanges, etc for Vapour LPG Line and water, air line on door delivery basis at LPG Bottling Plant, Durgapur including all duties, packing, loading, transportation, unloading at site, transit insurance and TPIA inspection charges but not limited to the following items in accordance with relevant specifications indicated in scope of work / drawing and instructions of Engineer in charge |
| 37 | Supply of ASTM A 106, Gr B, Seamless Pipe, BE, ASME B36.10, Size 100NB, Schedule-80 |
| 38 | Supply of ASTM A 106, Gr B, Seamless Pipe, BE, ASME B36.10, Size 80NB, Schedule-80 |
| 39 | Supply of ASTM A 106, Gr B, Seamless Pipe, BE, ASME B36.10, Size 50NB, Schedule-80 |
| 40 | 90 degree ELBOW (ASTM A234, Gr. WPB, B 16.9, 1.5D, BW, SEAMLESS) 300# all fitting should be forged fitting: 100NB Schedule 80 |
| 41 | 45 degree ELBOW (ASTM A234, Gr. WPB, B 16.9, 1.5D, BW, SEAMLESS) 300# all fitting should be forged fitting: 100NB Schedule 80 |
| 42 | 90 degree ELBOW (ASTM A234, Gr. WPB, B 16.9, 1.5D, BW, SEAMLESS) 300# all fitting should be forged fitting: 50NB Schedule 80 |
| 43 | UNEQUAL TEE (ASTM A 234, Gr. WPB, BW, ASME B 16.9, Seamless) 300# all fitting should be forged fitting: 150x150x100 NB Sch 80 x Sch 80 x Sch 80 |
| 44 | UNEQUAL TEE (ASTM A 234, Gr. WPB, BW, ASME B 16.9, Seamless) 300# all fitting should be forged fitting: 100x100x50 NB Schedule 80 |
| 45 | WNRF Flange Class 300 (ASTM A 105, ASME B 16.5, 300#) End thickness to be matched with pipe thickness, all fitting should be forged fitting: 100NB Schedule 80 |
| 46 | WNRF Flange Class 300 (ASTM A 105, ASME B 16.5, 300#) End thickness to be matched with pipe thickness, all fitting should be forged fitting: 80NB Schedule 80 |
| 47 | WNRF Flange Class 300 (ASTM A 105, ASME B 16.5, 300#) End thickness to be matched with pipe thickness, all fitting should be forged fitting: 50NB Schedule 80 |
| 48 | 25 mm( H)ERW pipe |
| 49 | 25 mm L & T Ball valve |
| 50 | 25 mm elbow |
| 51 | 25 mm MS union |
| 52 | WNRF Flange Class 300 (ASTM A 105, ASME B 16.5, 300#) End thickness to be matched with pipe thickness, all fitting should be forged fitting: 150NB Schedule 80 |
| 53 | Valve Full Bore Ball Valve, 50NB, 300# Flanged End (Use in LPG Line), Design conforming to API 6D, Fire Safe conforming to API 6FA or API 607 latest edition, Leakage Class - VI, details conforming Tender Specifications |
| 54 | 90 degree ELBOW (ASTM A234, Gr. WPB, B 16.9, 1.5D, BW, SEAMLESS) 300# all fitting should be forged fitting: 80NB Schedule 80 |
| 55 | 15 mm( H)ERW pipe |
| 56 | 15 mm L & T Ball valve |
| 57 | 15 mm elbow |
| 58 | 15 mm MS union |
| 59 | 15 mm Tee |
| 60 | Supply of spare Spiral Metallic Gasket Class 300: 150NB spiral gasket |
| 61 | Supply of spare Spiral Metallic Gasket Class 300: 100NB spiral gasket |
| 62 | Supply of spare Spiral Metallic Gasket Class 300: 80NB spiral gasket |
| 63 | Supply of spare Spiral Metallic Gasket Class 300: 50NB spiral gasket |
| 64 | HT stud and bolt for 6 inch flange |
| 65 | HT stud and bolt for 4 inch flange |
| 66 | HT stud and bolt for 3 inch flange |
| 67 | HT stud and bolt for 2 inch flange |
| 68 | Copper bonding for 6 inch flange |
| 69 | Copper bonding for 4 inch flange |
| 70 | Copper bonding for 3 inch flange |
| 71 | Copper bonding for 2 inch flange |
| 72 | Laying, fabrication, installation, erection at site along with all fittings, bends, Tee, flanges etc: LPG Piping work for LPG Vapour Services (Class 300): Work includes 100% NDT Testing of pipeline. Welder qualification approval of the same by TPIA is in the scope of contractor. TPIA charges for approval of welders qualification shall be included in the price. Fabrication includes cutting, edge preparation, including grinding of edged of pipe, fittings, flanges etc to match with the matching edges of uneven/different thickness wherever required, welding by certified welder, attachment of all pipe fittings, tees, reducer etc. Supply of necessary sockets, bolts, washers, metallic gasket etc in included in the scope. Measurement shall be considered with all fittings such as elbow, tee etc for payment. |
| 73 | 100 MM pipe line welding with argon weld the job include the cutting welding fabrication painting all complete |
| 74 | 80 MM pipe line welding with argon weld the job include the cutting welding fabrication painting all complete |
| 75 | 50 MM pipe line welding with argon weld the job include the cutting welding fabrication painting all complete |
| 76 | 25 MM pipe line welding with arc weld the job include the cutting welding fabrication painting all complete |
| 77 | 15 MM pipe line welding with arc weld the job include the cutting welding fabrication painting all complete |
| 78 | Radiography testing for 150 mm pipe joint |
| 79 | Radiography testing for 100 mm pipe joint |
| 80 | Radiography testing for 80 mm pipe joint |
| 81 | Radiography testing for 50 mm pipe joint |
| 82 | hydrotest of pipe line for vc new fabricated inlet and out let line . |
| 83 | Erection of Valves / Strainer / NRV / PAV etc of Class 300 as per direction of Engineer In Charge complete in all respect. Size 50 NB, Class 300, Flanged End |
| 84 | Civil Works |
| 85 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars & disposal of unserviceable material outside site to an unobjectionable place as/ direction of Engineer-in-charge |
| 86 | Demolishing brick work manually/mechanical means including stacking of serviceable material & disposal of unserviceable material outside premises at an unobjectionable place as / direction of Engg-in-charge |
| 87 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including taking out and disposal of excavated earth within or outside site to unobjectionable place and lift upto 1.5m, as directed by Engineer-in-charge. Disposed earth to be levelled and neatly dressed. Extra for levelling & neatly dressing of disposed soil completely to be paid separately. |
| 88 | Ordinary rock |
| 89 | Extra for levelling & neatly dressing of disposed soil completely as directed by engineer in charge |
| 90 | Supplying and filling in plinth with sand within specified grading zone of fine aggregates specified in table 3.1, clause 3.1.3 of attached specifications under floors, etc. in layers not exceeding 20cm in depth, each deposited layer to be compacted by ramming including watering, consolidating and dressing complete. |
| 91 | Local Fine Sand within grading zone IV |
| 92 | Providing and laying in position cement concrete of specified grade excluding cost of centering & shuttering. All work up to plinth level: |
| 93 | 1:2:4(1 Cement : 2 Coarse Sand :4 Graded stone aggregate of 20mm) |
| 94 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level |
| 95 | RCC 1 Cement :1½ Coarse Sand: 3 Graded Stone Aggregate 20mm |
| 96 | Supply of Steel reinforcement for R.C.C. including straightening, cutting, bending, placing in position and binding all complete at all levels |
| 97 | ii) Thermo Mechanically Treated Bars of Fe- 500D grade or more, conforming to IS1786 |
| 98 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 99 | i) Foundations,footings,bases of columns, etc. for mass concrete |
| 100 | 18mm thick Cement plaster skirting with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement. |
| 101 | White washing with 3 or more coats of lime to give an even shade |
| 102 | Excavating trenches of required width for pipes, cables etc including excavation for sockets, depth upto 1.5m including taking out excavated material, returning the soil as required in layers in not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering, etc. & stacking serviceable material for measurements and disposal of unserviceable material as directed outside site at an unobjectionable place in ordinary rock |
| 103 | Pipes, Cable etc. > 80mm < 300m dia |
| 104 | Providing and laying class-B 50mm dia GI pipe for cable routing under flooring/ EB post leading including sealing both ends with jute and Bitumen |
| 105 | Structural steel work riveted,bolted or welded in built up sections, trusses & framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: |
| 106 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade with two or more coats over an under coat of suitable shade with ordinary paint of approved brand and manufacture. |
| 107 | Roof/ Sprinkler line dismantling and placing back in existing pump-house over LPG vapour compressors civil foundation as directed by EIC. Carrying of vapour compressor from anywhere in the plant and positioning properly (using hydra/ chain-pulley arrangement if required) in the civil foundation and installation of V.C ready for hooking up with pipeline all complete as directed. |
| 108 | Lettering with black japan paint of approved brand & manufacture and (unit/letter/cm ht) |
| 109 | Supply and fixing of SOP chart, Datasheet in English, Hindi & local language framed in glass framework as per directed by E.I.C |
| 110 | P&ID modification and printing 3 copies Please Enable Macros to View BoQ information |