| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 & 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 2 | Excavation /trenching in ordinary soil including lift upto 1.5M. And lead upto 30m. Including watering ramming and dressing etc. and disposalof surplus earth as direction by E/l. from the foundation trenhes MORD Spec. No. 300. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor/Tractor munted appropriate equipment on prepaire surface mixing by mix in place method with rotavator at OMC, and compacting with smooth roller to achieve the desired density, complete as per Technical Specification Clause 408. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 4 | Providing, laying and spreading materials on a prepared sub base, cement @ 4% by weight to the spread materials manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 5 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom .Technical Specification Clause 503. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 6 | Providing, laying and rolling of open graded premix carpet of 20 mm Thickness composed of 13.2mm to 5.6mm Aggregates using vg-10 bitumen to required line grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical specification Clause 508. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST) for proper completion of Work. |
| 7 | Providing and laying seal coat sealing the voids in a bitumenous surface laid to the specified levels, grade and cross fall using type-C as per technical specification Clause 510. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 8 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 9 | Construction of 600mm Dia Hume Pipe Culvert :-Excavation in foundation in ordinary soil including lift upto 1.5M. and lead upto 30M. including watering ramming and dressing etc. and disposal of surplus earth as direction by E/I. upto a distance of 30M. from the foundation trenches complete in all respect. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 10 | Construction of 600mm Dia Hume Pipe Culvert :-PC.C. 1:3:6 cement, coarse sand 40mm. Gauge stone ballast including complete work . (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 11 | Construction of 600mm Dia Hume Pipe Culvert :-Supply of 600mm. Dia pipe. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 12 | Construction of 600mm Dia Hume Pipe Culvert :-Supply of coller (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 13 | Construction of 600mm Dia Hume Pipe Culvert :-Laying of 600mm. Dia pipe. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 14 | Construction of 600mm Dia Hume Pipe Culvert :-M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth etc. required for proper completion of the work. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 15 | Construction of 600mm Dia Hume Pipe Culvert :-Struck cement pointing in 1:3 cement fine sand mortar including supply of all materials labour tools and plants etc. required for proper completion of the work.(Flus Pointing) (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 16 | Construction of 600mm Dia Hume Pipe Culvert :-12 mm thick Plaster with Cement mortor in proportion of 1:2 cement and Coarse sand . (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 17 | Construction of 600mm Dia Hume Pipe Culvert :-Painting Roofs or others work in one coat coat of ready mixed paint primer one coat coat of appproved paint(british ,Antisol) including supply of all materials laboure tools and plantsetx required for proper complition of the work As per direction of E/I. SI N0 04. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 18 | Construction of 600mm Dia Hume Pipe Culvert :-Providing and laying cement concrete in 1:2:4 cement coarse sand and 20 mm nominal size of grit . (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. |
| 19 | Construction of 600mm Dia Hume Pipe Culvert :-Colour washing one coat using approved colouring materials of buff,blue,gray or broun shade including supply of all materials labour tools and plants etc. required for proper completion of the work. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work. Please Enable Macros to View BoQ information |