|
| 1 | Item Description |
| 2 | Dag belling 2.5 cm to 5 cm Deep |
| 3 | Jungle clearance by scaping of grass and shrubs |
| 4 | 15 से.मी. तक औसत मिटटी काटकर जमीन की सतह को संवारना (Dressing) तथा वनस्पती तथा छोटे पौधों को हटाना तथा तुच्छ पदार्थ और कुडा करकट को 1.5 मीटर उठान तथा 50 मीटर दूरी तक डालना। |
| 5 | Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Cut off Wall (From 3 m depth to 4.5 m depth) |
| 6 | Watering of earth including cost of carriage of water when source of water is up to 1km |
| 7 | Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Cut of Wall (From 4.5 m depth to 6.0 m depth) |
| 8 | Compaction of earth or highly weathered strata by manually or plain roller. (Density 90% proctor) |
| 9 | Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Cut of Wall (From 6 m depth to 6.5 m depth) |
| 10 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Soft Soil) I |
| 11 | Supplying, laying & spreading of LDPE film of 250 micronon bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. Item No. 39 Ch No IX, WRD 2023 |
| 12 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) |
| 13 | Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50 mt and lift up to 1.5 m |
| 14 | Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required. |
| 15 | Excavation including loading, unloading, disposal and dressing of excavatedearth within initial lead of 50m and lift up to 1.5m including dressing ofexcavated area and dewatering wherever required complete in all respect. Hard / dense soil |
| 16 | मिटटी का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना, उतारना व स्टेकिंग सहित | (परिवहन की लम्बाई निकटतम रूट से गणना की जावेगी न कि सड़क मार्ग से) 2 कि.मी. |
| 17 | Side shuttering including propping etc. complete (to achieve finish F 2 for : (a) Block joints of foundation stilling basins buckets, aprons etc. (non-suspended horizontally laid mass concrete) |
| 18 | कल्वर्ट/पुलिया निर्माण हेतु आरसीसी.(रेन्फोसमेंट सीमेंट कंक्रीट)NP3 ह्युम पाइप एक पंक्ति में आवश्यक ढलान देते हुए सीमेंट मसाला 1:2 में बिछाने/लगाने का कार्य मय कोलर सहित |(मिटटी खुदाई,कंक्रीट व चिनाई कार्य के अलावा) 450/500 mm |
| 19 | Board Display |
| 20 | Dry stone pitching using 15 to 30 cm thick dressed stone including all lift and supply of material etc. |
| 21 | नींव तथा कुर्सी में पत्थर की वे रद्धा-ढोका सीमेंट-बजरी मसाले में, मय बगल की झिरी बन्द करना तथा तराई आदि सहित।(1:6 RATIO) |
| 22 | 1:4:8 (i) 40 एमएम क्रेशर ब्रोकन पत्थर की गिटटी के स्थान पर हाथ से टूटी हुई रोडी के उपयोग करने पर वही मात्रा देय होगी परन्तु गिटटी की दर में 30 प्रतिशत की कटौती की जावेगी।(ii) Vibratar and mixure का उपयोग नहीं करने पर 3% कटौती की जावे Please Enable Macros to View BoQ information |