| 1 | Hiring of robotic machineries including rate of interest, GST @ 18% and annual maitenance contract for the robotic machineries contract for 2 years covering a length of 3000m per month. |
| 2 | Robocam |
| 3 | Robo90 |
| 4 | Robo250 |
| 5 | For Sl. Nos 1 to 3, if the combined hiring and deployment of either Robo90 or Robo250 or Robocam or altogether in a month minimum of 3000m. Payment will be made on actual length day/month restricted to billl of quantities of 72000 metres for two-year period for each Robo90, Robo 250, Robo cam |
| 6 | The End-to-End Operations and Maintenance Charges cover the monthly cost for deploying a dedicated Robo 90, Robocam and Robo250 robotic inspection team over a 24-month period. This includes complete team management, field deployment as per instructions from the engineering team, defect identification during inspections, and submission of detailed reports with Al-based analysis. Monthly number of days working: 24, Number of team members: 4, Number of working hours per day: 8 Hours, Number of defect detection per day: 3 (subjected to availability of pits) or 125m per day. Scope of work includes finding contamination source, leak detection, improper joints, illegal connections/ferrules), encrustation level and other anomalies in the water pipeline. Inclusive of GST @ 18% & Fuel cost. |
| 7 | Technically qualified Electrical, Mechanical Artificial Intelligence Qualified Engineer |
| 8 | Driver for operating the vehicle |
| 9 | Other technical Artificial Intelligence Qualified engineers |
| 10 | Routine upkeep of the robot |
| 11 | Structural steel barricade for 2 years |
| 12 | Personel protective gears for workers (Face mask, hand gloves, Boots, Reflecting jackets, etc..) |
| 13 | AI Software integration with Complain Management Software system of CMWSSB and onboarding of Engineers (for lifetime) |
| 14 | Monthly subscription for reporting and data Management including GIS updation in CMWSSB HO GIS department |
| 15 | Hiring of vehicles |
| 16 | Cutting asphalitc concrete road Rate should involved for 30 pits using either Robocam or Robo 90 or Robo 250 for 2 years |
| 17 | Bus route for dia 100mm to 200mm |
| 18 | Non bus route for dia 100mm to 200mm |
| 19 | Bus route for dia 250mm to 500mm |
| 20 | Non bus route for dia 250mm to 500mm |
| 21 | Hire charges for diesel pumpset for 3 HP with fuel and crew charges including transportation |
| 22 | Cutting CI mains labour only ; |
| 23 | 100mm |
| 24 | 150mm |
| 25 | 200mm |
| 26 | 250mm |
| 27 | 300mm |
| 28 | 400mm |
| 29 | 500mm |
| 30 | i)Supply and Delivery of MJ Collars ii)Conveying and fixing the D.I. collars including earth work excavation as per schedule No.1.1. |
| 31 | 100mm |
| 32 | 150mm |
| 33 | 200mm |
| 34 | 250mm |
| 35 | 300mm |
| 36 | 400mm |
| 37 | 500mm |
| 38 | Laying D.I. pipes including earthwork excavation for trenches in hard stiff clay, blackcotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil depositing the earth on banks with initial lead of 10 m and initial lift of 2m carting the pipes from any of the Board’s Stores to the site of work lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and ramming to consolidation, etc., complete for the pipes of following diametres. |
| 39 | 100mm @ 1.5m depth |
| 40 | 150mm @ 1.5m depth |
| 41 | 200mm @ 1.5m depth |
| 42 | 250mm @ 1.5m depth |
| 43 | 300mm @ 1.5m depth |
| 44 | 400mm @ 1.5m depth |
| 45 | Conveying D.I. pipes of diameter for 500mm dia and above upto 1200mm dia from the site of stacking to the site of constructions including earthwork excavation in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders and hard gravelly soil depositing the earth on banks with initial lead of 10 metres and initial lift of 2m, timbering the trenches, pumping out subsoil water, lowering the pipes into the trenches, aligning and refilling the trenches with excavated earth, watering, ramming to consolidation and disposing the surplus earth, etc., complete, for 1.0 metre. - Night works |
| 46 | 500mm @ 2.5m depth |
| 47 | Providing Wet mix macadam including premixing the material with water at OMC in mechanical mix plant carriage and laying in uniform layers and compacting etc.Complete as per clause 406 of MORT&H specifications |
| 48 | Bus route for dia 100mm to 200mm |
| 49 | Non bus route for dia 100mm to 200mm |
| 50 | Bus route for dia 250mm to 500mm |
| 51 | Non bus route for dia 250mm to 500mm |
| 52 | Cement concrete 1:2:4 using Crushed stone sand (Msand) and 12 to 20mm gauge hard broken stone jelly for plain concrete work including laying compacting curing, etc., complete. |
| 53 | Bus route for dia 100mm to 200mm |
| 54 | Non bus route for dia 100mm to 200mm |
| 55 | Bus route for dia 250mm to 500mm |
| 56 | Non bus route for dia 250mm to 500mm |
| 57 | Fuel for operating the vechicle (Diesel)- 5 litre per day |
| 58 | Fuel for operating the Robo (petrol)- 7 litre per day |
| 59 | * No GST for the item in Sl.No.57 & 58 |
| 60 | Sub Total (excluding GST) |
| 61 | GST @18% (for Sl.No.1 to 56) Please Enable Macros to View BoQ information |