|
| 1 | Removal of Accumulated Sludge in Receiving Chamber ,Grid chamber,Primary Sedimentation tank ,Bio Arration tank,Secondary Clarifier and Chlorin tank with using of Mechanical Equipments ,And Men and Materials and All Safety measures like Gum Boot ,Hand Glouse with all Initial aspects etc complete as per standards and the direction of the Departmental officers etc complete |
| 2 | Supply and delivery and Fixing of 1 HP Monoblock Motor pump with ISO Quality as per standards and the direction of the Departmental officers etc complete. M-1063 (PWD SOR 25-26, Pg no-169) |
| 3 | Supply and delivery and Fixing of 2 HP Monoblock Motor pump with ISO Quality as per standards and the direction of the Departmental officers etc complete. M-1064 (PWD SOR 25-26, Pg no-169) |
| 4 | Supply and delivery and Fixing of Air blower 40 HP Motor (Squirrel Cage or Mono block type) with ISO Quality as per standards and the direction of the Departmental officers etc complete by replacing motor make Kirlosker,Speed 1440 rpm. M-2683 (PWD SOR 2025-26, Pg no 285) |
| 5 | Supply, erection, testing and commissioning of fire fighting application monoblock motor pumpset of 900 LPM at 40metres head to develop 3.5 kg/sq.cm at the heightest andfarthest hydrant point to make 30 m water jet at the time offire fighting emergency cicumstances, coupled with 11 KW /15 HP rated three phase 414 volts, 50 Hz, 2880 rpm electrical motor the pump with cast ron body, bronze impeller, rope gland packaging, suction size of 80 mm dia. delivery size of 65 mm dia., including the cost of foundaton concrete antivibration mounting, rain safety hood and etc. complete asdirected by the Departmental Officers (Kirloskar make KDS1555+ or Equivalent) Each 54700.00 by replacing motor make KAY,Capacity 1020 cubic meter per minites, speed 1077 rpm. M-0778 (PWD SOR 2025-26 , Pg 136) |
| 6 | FULL BORE ELECTROMAGNETIC FLOW METER WITH 5 YEARSWARRANTY. Electromagnetic Flow Meter shall be a velocity sensing Electromagnetic type, microprocessor based signal converter, sealed housing, flanged tube meter for 1.0 Mpa working pressure, manufactured to highest standard available for mag-meters, equipped with minimum six digit digital totalizers, reading in units of (kilolitres/ cubicmeter) and shall be accurate within 0.5% of Measured value, shall operate within a range of 0.3m/sec to 4 m/sec and be constructed as follows:Meter tube (Sensor) shall be fabricated from stainless steel tube and use class PN10 flat face carbon steel flanges in accordance with IS 1538. These flanges shall be welded to the flow tube. The internal and external of the meter tube shall be blasted to near white and lined with hard rubber/ Polyurethrene/ PTFE preferably by SBR or EPDM. Meter tube shall have a constant nominal inside diameter offering no obstruction to the flow. The accuracy should be inclusive of linearity, hysteresis, repeatability, temperature and pressure effects Coil Housing shall be fabricated from stainless steel (SS 304) with Anticorrosive paint for corrosionresistance and welded to the tube providing a completely sealed environment for all coils, electrode connections and wiring harness capable of submerged or buried operation with IP 68 protection. Signal Converter shall be pulsed DC coil excitation type with auto zeroing. The signal converter shall be remotely mounted away from the meter. The converter shall indicate direction of flow and provide a flow rate indication and a total of flow volume for both forward and reverse directions. The converter shall provide an isolated 4-20 mA output into minimum 500-ohm load and a frequency output of a maximum of 0-10 KHZ and a scaled pulse output, Communication interface is RS485, HART output, . The microprocessor based signal converter shall have a selfdiagnostic test mode and a backlit display that continuously displays “Rate of Flow” and “Total Volume”. Converter shall be supplied with a programmable low flow drop out Higher flow and empty pipe zero return. The signal converter housing should be die-cast aluminium with glass window. The converter cum transmitter should be fully programmable form the front facia. The programming should be user friendly, self-prompting menu driven. Flowmeter test calibration certificate from FCRI, flow test lab/ NABL accridiated lab to be furnished. |
| 7 | 500 mm Electromagnetic flow meter [Inlet & Out let] [TWAD SOR 2025-26 Vol II, Page No.98] WD-M1400 |
| 8 | 400 mm Electromagnetic flow meter [Inlet & Out let] [TWAD SOR 2025-26 Vol II, Page No.98] WD-M1398 |
| 9 | Ductile Iron Socket/Spigot Pipes For Class K9, as per IS 8329/2000. (Twad SOR 2025-26, Pg no 39) |
| 10 | 500mm WD-M0643 |
| 11 | 400mm WD-M0641 |
| 12 | Submersible Centrifugal Sewage Non Clog Pumps. Supply and delivery of submersible centrifugal sewage non-clog pumps, vertical spindle type pump, wear resistance with submersible motor for the various duty conditions. Pump shall be capable of handling min 100 mm solid size with sewage specific gravity of up to 1.05. Pump shall be of robust construction, Liquid passages shall be finished smooth and designed as to allow free passage to solids. Pump Impeller should be of Non-clog semi open type, single vane / multi vane preferably contra bloc or vortex impeller design. Double mechanical seal with silicon carbide faces should be provided to protect the motor from ingress of sewage along the shaft. The critical speed of the rotor shall be at least 30% above the operating speed. Pumps should have double bearings between the pump & motor. The bearings life shall be minimum 100,000 hrs of operation with greased for life. Pump should be provided with automatic coupling device including pedestal, duck foot bend, stainless steel guide pipe or related accessories of suitable size to facilitate lifting and lowering into guide rails for easy maintenance. Pump shall be provided with a stainless steel lifting chain conforming to BS 970 Gr 304. Pump speed shall be of 9600 rpm for high duty pumps and 960/1450 rpm for low duty pumpsets. Casing and impeller should be of CI Gr. FG 260:IS210 more preferably with hardened impeller.Shaft should be of stainless steel AISI 410. All the fasteners and bolts shall be of AISI 410.The submersible motor shall be operated with 3ph, 415 V (+or– 10%), 50Hz (+or-5 %) dry induction type. Motor shall be capable of giving rated output without reduction in the expected life span when operated continuously. The rotating assembly shall be dynamically balanced as per standards. The starting current of the motor shall not exceed 200% of rated full load current for Star / Delta or ATS starting under any circumstances .The motor shall be suitable for full voltage star delta / ATS starting. The locked rotor current of the motor shall not exceed 600% of full load current unless otherwise specified. Motor shall be designed to withstand 120% of rated speed for two minutes without any mechanical damage, in either direction of rotation. The motor vibration shall be within the limit specified in applicable standards. Motor should be of IE2, explosion proof compatible for VFD operation together with star-Delta /ATS starter, protection against increase in stator winding temperature (15 deg Celsius), bearing temperature, leakage in the stator housing and terminal box shall be provided and to be suitably interlocked with the control panel for tripping the pump in case of increase in temperature beyond set limit. Insulation class shall be of “Class H” and degree of protection shall be of IP 68 as per IS 4691. Motor shall be suitable for continuous operation in fully submerged or partially submerged condition.The pumpset shall be supplied with power cable of |
| 13 | Supply, erection, testing and commissioning of Fire Fighting Application direct on line main control panel to control electrical Terrace Pump Motor of 3.75 KW / 5 HP rated 415 volts / 50 Hz 3 phase, 2880 RPM including necessary auto / manual operations, over load relay, selector switches arrangements, voltmeter and ammeter provision, etc., as directed by the Departmental Officers. M-0787 . (TWAD SOR 2025-26, Pg- 140) |
| 14 | 200mm CI Sluice Valves Non Raising spindle types to pressure rating of 1.6 pn to be used in pump houses (long body/ long face to face) conforming to is and with 5 years warranty. Wd-m1125 (Twad SOR 2025-26, Pg no 71) |
| 15 | 200mm Ductile Iron Class Pn10 Flanged Pipes as per IS 8329/2000. (Twad SOR 2025-26 Pg no 40) |
| 16 | 1m Length of pipes WD-M0653 |
| 17 | 2m Length of pipes WD-M0669 |
| 18 | PVC Insulated And Sheathed 3 Core Flat Type Copper Cable Conforming To Is 694/1990 and as Amended Thereafter. WD-M1978. Twad SOR 2025-26 Pg no 141 |
| 19 | In HT supply using LTCT metering box as per IE rules and TANGEDCO norms (Above 150HP below 200 HP) 112-150 KW. TWAD SOR 2025-26, Pg no 147 |
| 20 | 3T capacity hand operated over head Travelling (HOT) crane suitable for a span upto 6 Mtrs, and travel length upto 10 Mtrs. with clear lift upto 6 M including gear type chain pulley block and geared Travelling trolley complete with all accessories including girder |
| 21 | Labour charges for the erection of submersible pumpset in borewell/ openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days. WD-W0875 Above 30 HP to 40 HP Each22588.87 |
| 22 | Rewinding the ATS Starter Transformer core and Refixing the Transformer re-connecting the cable and including cost of New Transformer oil and Reparing, servicing of ATS Starter removing the damaged parts and fixing the new contactor, Timer, Preventer and including cost of complete ATS Starter Panel wiring and providing the new 1.5Sqmm & 16Sqmm Copper Cable, NO/NC connector, Push Buttom and indicator lamp etc., complete. Please Enable Macros to View BoQ information |