|
| 1 | Construction of Bus Shelter Near Government Arts and Science College H/o Melvenkatapuram Panchayat in Sholinghur Block Ranipet District |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. |
| 3 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. |
| 4 | Collection and supply of gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, |
| 5 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. |
| 6 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below Basement |
| 7 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above Basement |
| 8 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. |
| 9 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. |
| 10 | Paving the floor with Granite slab 20mm thick in floors in CM 1:3, 20mm thick Granite slab (Ruby Red / Raw silk) 20mm thick for floor for etc Complete |
| 11 | Nosing for Granite Slab Double Nosing inculding cost and Convenyance for all cost for etc Complete |
| 12 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 13 | Weathering course with brick jelly lime concrete using 20mm brick jelly with of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete |
| 14 | Finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site |
| 15 | Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 16 | Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 17 | Exterier Emulsion painting two coats with approved emulsion paint including cost and conveyance of all materials to and all labour charges etc.complete |
| 18 | Electrical Arrangements Light point & Fan point (SD:23) Concealed |
| 19 | Supply and 40W tube light (SD No.88) |
| 20 | Ceiling fan (SD No.107) |
| 21 | Supply of 11W CFL Bulb (SD :80) |
| 22 | Bulk head CFLfitting (SD No.83) |
| 23 | 9W CFL twin Street Light (SD:94) |
| 24 | TNEB Meter board with Fuse unit (SD No.127) |
| 25 | Service line (SD No.67) |
| 26 | Service connection with 'GI' Pipe (SD No.69) |
| 27 | Plug Point (SD No.36) |
| 28 | E.B Deposit |
| 29 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |