| 1 | Recovery of 80MM old ILPB as per siteNote:- Rate of Recovery of ILPB will not be accepted below Rs. 6 |
| 2 | Lifting and Pumping of Rain water and Nala water with the help of tractor compressor pumping machinery and Suction delivery suction etc. Complete in All Respect. |
| 3 | Repair of damaged line for sewer and water line complete |
| 4 | Supply and Laying of 8` PVC pipe 6 kg pressure ISI Marka |
| 5 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] |
| 6 | [10.30.4]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 4. Ordinary cement without any pigment [Through Rate] |
| 7 | [10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [Through Rate] |
| 8 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] |
| 9 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 10 | [17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam (53mm to 22.4 mm)Grading II with screenings Type “B” (11.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] |
| 11 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate] |
| 12 | [17.61.1]PIPE CULVERTS 1. Providing and Laying 600 mm dia Reinforced Cement Concrete Pipe NP3 / NP-4P /prestressed Concrete Pipe on First Class Bedding in Single Row Providing and Laying Reinforced cement concrete pipe NP3 /NP-4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets 1000 mm dia, as per clause 2900 of MORT&H specifications [Through Rate] |
| 13 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] |
| 14 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] |
| 15 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] |
| 16 | [26.353]Providing and stacking of Bottle palm of ht. 120-150 cm bottom girth 15-20 cm well developed in big poly bags of size 25 cm as per direction of the officer-in-charge. [Through Rate] |
| 17 | [26.432]Providing and stacking of Washingtonia filifea palm stem ht. 90-105 cm with 6-7 healthy leaves lush green leaves well developed in big size HDPE Bags as per direction of the officer-in- charge. [Through Rate] |
| 18 | [26.58.3]Supply and installation of garden bench 3. Cast Iron bench of 1800 mm length, 900 mm width, 450 mm seating height, sides made of cast iron. Seat and back shall be made of 10 strips of M.S. pipes 63 mm x 25 mm of 14 gauge with one M.S. Flat 25 x 10 mm welded at the centre, below and back of the seat and back rest. Spray painted with approved brand paint. Fixed by grouting with 1:2:4 cement concrete (Minimum weight of each bench 105 kg). All materials required to be as per BIS specifications. [Through Rate] |
| 19 | [26.63.2]Providing and fixing steel tree guard 2. MS circular tree guard with wire mesh, having 4 No. legs of angle iron size 25x25x3mm, 1.80 metre. height, 3 No rings of M.S Flats of 25 x 6 mm, 60cm dia and fixing of wire mesh size 50x75mm. Tree guard in two halves bolted together with 8mm dia & 30 mm long bolts, and fixing 250 mm X 100 mm iron plate, fixed in ground with 1:2:4 cement concrete, complete in all respects. Minimum weight should be 23 kgs [Through Rate] |
| 20 | [27.49]Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm and MORT&H specification 800. [Through Rate] |
| 21 | [3.1.3]By Mechanical Transport including loading, unloading and stacking 3. Manure or sludge [3km] |
| 22 | [34.2.1]Cast in Situ Cement Concrete M 20 Kerb with ChannelConstruction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 1. Using Concrete Mixer [Through Rate] |
| 23 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 24 | [4.4.1]Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 1. All kinds of soil [Through Rate] |
| 25 | [4.41]Earth work of silt-clearance of channels and drains. Kassi work undressed involving an average horizontal through upto 2 metres and average vertical lift upto 0.5 metre. [Through Rate] |
| 26 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 27 | [6.1.7]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 7. 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) [Through Rate] |
| 28 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 29 | [6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 30 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] |
| 31 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] |
| 32 | [6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. [Through Rate] |
| 33 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate] |
| 34 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] |
| 35 | [6.43]Providing, hoisting and fixing above plinth level up to floor four level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] |
| 36 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] |
| 37 | [7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] Please Enable Macros to View BoQ information |