| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1500 mm. |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. |
| 3 | Cement concrete with graded jhama khoa ( 30 mm size ) Excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion |
| 4 | Brick work with 1st class bricks in cement mortar (1:6) , (a) In foundation and plinth |
| 5 | Single Brick Flat Soling of picked jhama bricks including ramming anddressing bed to proper level and filling joints with local sand. |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) f) 25 mm to 30 mm shuttering without staging in foundation |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (i) Tor steel/Mild Steel , (i). Sail / Tata / Rinl |
| 8 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmnominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes..(a) Pakur Variety |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (b) 20 mm thick plaster |
| 10 | Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. |
| 11 | GST @ 18% |
| 12 | Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |