|
| 1 | TOTAL |
| 2 | GI SHEET SUPPORTED BY BAMBOO STRUCTURE AND COVERED WITH WALL CLOTHING(NON VISIBLE FROM BOTH SIDE AND OF DARK COLOUR) FOR PARTITION OF ROOMS.CONSIDERING THE STRUCTURE SHALL REMAIN FOR THREE DAYS. ARRANGEMENTS TO BECOMPLETED WITHIN P-2 DAY. |
| 3 | BAMBOO STRUCTURE WITH FIRE AND WATERPROOF TIRPAL SHED OUTSIDE POLLINGSTATIONS AS TEMPORARY VOTER'S SHADE, CONSIDERING THE STRUCTURE WILL REMAINFOR 2 DAYS. ARRANGEMENTS TO BE COMPLETED WITHIN P-1 DAY. |
| 4 | PLASTIC CHAIR (WITHOUT ARMS) ON HIRE BASIS. |
| 5 | Plastic Table (3'X2') on Hire Basis |
| 6 | 200 Ltr. Drum PVC with lid on Hire Basis(1 nos requirement for per station). |
| 7 | 10 ltr. Capacity plastic Bucket. |
| 8 | 1 ltr. Capacity plastic Mug. |
| 9 | BUILDING SIGNAGE |
| 10 | POLLING STATION SIGNAGE (M: 12 INCH. IN DIAMETER) |
| 11 | HIRE&LABOUR CHARGES OF TEMPORARY WATERPROOF PANDEL WITH SAL BULLAH POSTCT.8MTR C/C OF APPROVED SIZE(MIN 4\\"DIA) WITH BAMBOO, RUNNER WITH WATERPROOF TARPOLIN COVER ON ROOF OF THE PANDEL AND SIDE WALLS AND COVERING OF BAMBOO POST BY WHITE COLOUR CLOTH AND ETC.INCLUDING CUTTING CONCRETE HOLE AND MENDING GOOD DAMAGES COMPLETE AS PER DIRECTION OF ENGINEER-IN-CHARGES. |
| 12 | EXTRA FOR HIRE AND LABOUR CHARGES FOR ERECTING OF NEW G.C.1.SHEET WALL INGINCLUDING POST & FRAMES ETC.**NO GCI SHEET AT THE LEFT SIDEOF ENTRANCE AREA ABOVE 7 FT HEIGHT(FOR VENTILATION PURPOSE). |
| 13 | EXTRA FOR HIRE AND LABOUR CHARGES FOR GALVANISED CORRUGATED IRON SHEET WORK(EXCLUDING THE SUPPORTING FRAME WORK) FITTED AND(FIXED WITH10 MM.DIA J OR L HOOK-BOLTS, LIMPET AND BITUMEN WASHERS AND PUTTY COMPLETE WITH150MM.END LAP AND ONE CORRUGATION MINIMUM SIDE LAP.(PAYMENT TO BE MADE ON AREA OF FINISHED WORK)(I)INROOT:-WITH0.60MMTHICKSHEET. |
| 14 | HIRE AND LABOUR CHARGES FOR ERECTING PLATFORM WITH 19 MM THICK PLY AND NECESSARY POST BRACING RUNNER OF SUITABLE SECTION AND ALSO PROVIDING TWO NOS RAMP AS PER DIRECTION OF ENGINEER-IN-CHARGE. |
| 15 | HIRE AND LABOUR CHARGES FOR LAYING SYNTHETIC CARPET (PREFERABLY BROWN COLOR) INSIDE ZOOM & RAMP. |
| 16 | SUPPLYING ON HIRE BASIS CUSHIONED CHAIRS WITH WHITE COVERED: THE BACK OF THE CHAIR KNOTTED WITH 3? WIDE RIBBON FOR VLP SARRANGING PROPERLY ON THE DRASASPER DIRECTION OF ENGINEER-IN-CHARGE INCLUDING CARRIAGE OT CHAIRS ETC.COMPLETE. |
| 17 | SUPPLYING ON HIRE PVC CHAIRS WITH ARM DURING FUNCTION AND ARRANGING THOSE PROPERLY ON GROUND AS PER DIRECTION OF ENGINEER- IN CHARGE INCLUDING CARRIAGE OF CHAIRS TO SITE,THEIR RETENTION TILL THE ENDOF THE FUNCTION AND THEIR REMOVAL AFTER CONCLUSION OF FUNCTION INCLUDING COST OF ALL LABOUR AND MATERIAL COMPLETE.(FOR OUTSIDE SECURITY PERSONNEL) |
| 18 | SUPPLYING ON HIRE BASIS WOODEN TABLE (3'X2?) WITH TABLE CLOTH. |
| 19 | SUPPLYING ON HIRE BASIS FOR WOODEN DOORS WITH LOCKING ARRANGEMENTS |
| 20 | HIRE AND LABOUR CHARGES FOR SUPPLYING 6 (SIX) NOS TUBELIGHT, 1(ONE) NO 60 WATT LED BULB,4(FOUR) NOS STANDING FAN,3(THREE)NOS PLUG POINT INCLUDING ONE NO 5AMP PULGPOINT & MAKING CONNECTION WITH THE EXISTING MAIN INCLUDING ALL NEW WIRE OF SUFFICIENT GAUGE AND MCB |
| 21 | HIRE AND LABOUR CHARGES FOR SUPPYLING 1(ONE) NO 6KGABC POWDER TYPE FIRE EXTINGUISHER. Please Enable Macros to View BoQ information |