| 1 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. In ground floor including roof |
| 2 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes |
| 3 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with rewuired bracing for concrete slabs, beams, columns, lintels, curved or straight including fitting , fixing and stricking out after completion of works. 25 mm to 30 mm wooden shuttering . Upto Ground floor roof level |
| 4 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, strips binders etc. including supplying of roads, initial straightening and removal of loose rust (if necessary) cutting to requisite length hooking and bending etc. complete as per drawing and direction.For M.S. / Tor steel.Upto Ground floor roof level. |
| 5 | Plaster (to wall, floor, etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints roughening of concrete surface including chipping and application of cement slurry where necessary etc. complete. |
| 6 | 15 mm thick plaster. In ground floor. With 6:1 cement mortar. |
| 7 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or concrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface thoroughly, complete as per manufacturer's specification and as per direction of the EIC. One Coat .Ground floor |
| 8 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.Two Coat . b) Normal Acrylic Emulsion |
| 9 | Priming one coat on steel or other metal surface with synthetic enamel/ oil bound primer of approved quality including smoothening surfaces by sand papering etc.On steel surface |
| 10 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary. On Steel surface / hi- gloss. Two coats (with any shade except white). |
| 11 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another withbracket, gussets, cleats as per design, direction of Engineer-inchargecomplete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. |
| 12 | Supplying fitting and fixing 600 mm ( ±30 mm) diametre R.B.T(Reinforced Barbed Tape) Concertina fencing on wall top using concertina coils stretched to approx.6 meters length at site clipped with two nos. of horizontal R.B.T strands which will be tensioned and fixed with the vertical M.S angle iron posts by means of security fasteners (such as 'C' clips, R.B.T clips etc.) |
| 13 | Sub Total |
| 14 | Add GST @ 18% on Sub-Total Cost, i.e. |
| 15 | Add Labour Welfare Cess @ 1% on Total cost after GST, i.e. Please Enable Macros to View BoQ information |