BOQ and Calculation Sheet for Calculation Purpose Only. TS No. BHE/PW/PUR/BWT6-SMX/PK5/315 BOQ and Calculation Sheet for Balance work of of left of SCAPH & its associated structure/equipment in all respect, left out/pending welding of SCAPH, KLT/ATT of SCAPH duct, clearance from BHEL/Customer for insulation, application of insulation and cladding in all respect along with suitable scaffolding, Erection & welding of all necessary nozzles for SCAPH ducts including marking/cutting & fit up of nozzles & equipment at 1X660MW, U#6, MAHAGENCO Bhusawal-425307. Sl.No. Ref.No. Description Unit Quantity % Weightage w.r.t. Total Quoted Price Rate Amount Remarks Bidder to enter Per MT amount in Rs. for subject work here Excluding GST 1.0 Erection, testing & commissioning of left of SCAPH & its associated structure/equipment in all respect, left out/pending welding of SCAPH, KLT/ATT of SCAPH duct, clearance from BHEL/Customer for insulation, Erection & welding of all necessary nozzles for SCAPH ducts including marking/cutting & fit up of nozzles & equipment a on pre-assembly wherever applicable (if not applicable, this portion shall be clubbed with placement in position) MT 19.0 0.25 0.0 0.0 b placement in position MT 19.0 0.1 0.0 0.0 c alignment MT 19.0 0.1 0.0 0.0 d welding/bolting/fixing MT 89.0 0.15 0.0 0.0 e hangers & supports etc wherever necessary as per drg MT 19.0 0.25 0.0 0.0 f air and gas tightness test/KLT MT 89.0 0.05 0.0 0.0 g area cleaning, temporary strcture cutting/removal and return of scrap MT 19.0 0.03 0.0 0.0 h punch list points/pending points liquidation MT 19.0 0.03 0.0 0.0 i material reconciliation MT 19.0 0.03 0.0 0.0 j completion of contractual oblication MT 19.0 0.01 0.0 0.0 2.0 Application of insulation in all respect along with suitable scaffolding ( Wool matress Insulation) a placement in position MT 30.0 0.5 0.0 0.0 b alignment MT 30.0 0.15 0.0 0.0 c welding/bolting/fixing MT 30.0 0.15 0.0 0.0 d completion of roof skin casing and al clading MT 30.0 0.05 0.0 0.0 e area cleaning, temporary strcture cutting/removal and return of scrap MT 30.0 0.05 0.0 0.0 f punch list points/pending points liquidation MT 30.0 0.05 0.0 0.0 g material reconciliation MT 30.0 0.04 0.0 0.0 h completion of contractual oblication MT 30.0 0.01 0.0 0.0 3.0 Erection of iron part like Fixing pin, support channel etc. ( Iron Part Insulation) a placement in position MT 1.0 0.5 0.0 0.0 b alignment MT 1.0 0.15 0.0 0.0 c welding/bolting/fixing MT 1.0 0.15 0.0 0.0 d completion of roof skin casing and al clading MT 1.0 0.05 0.0 0.0 e area cleaning, temporary strcture cutting/removal and return of scrap MT 1.0 0.05 0.0 0.0 f punch list points/pending points liquidation MT 1.0 0.04 0.0 0.0 g material reconciliation MT 1.0 0.05 0.0 0.0 h completion of contractual oblication MT 1.0 0.01 0.0 0.0 4.0 Erection of Cladding sheet. (Insulation Cladding Sheet) a placement in position MT 2.0 0.5 0.0 0.0 b alignment MT 2.0 0.15 0.0 0.0 c welding/bolting/fixing MT 2.0 0.15 0.0 0.0 d completion of roof skin casing and al clading MT 2.0 0.05 0.0 0.0 e area cleaning, temporary strcture cutting/removal and return of scrap MT 2.0 0.04 0.0 0.0 f punch list points/pending points liquidation MT 2.0 0.05 0.0 0.0 g material reconciliation MT 2.0 0.05 0.0 0.0 h completion of contractual oblication MT 2.0 0.01 0.0 0.0 Total Amount for Entire Work Excluding GST 0.0
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.