| 1 | Tower superstructures |
| 2 | Galvanized lattice steel tower superstructure(approx. HT steel: 30%, MS: 70%) including hangers, gussets, strain plate, step bolts etc. for different tower types.Total 11 Nos of towers |
| 3 | Partially galvanized stub angle with cleat for 11 Nos. of towers |
| 4 | Galvanized iron nuts & bolts, spring washers, step bolts etc for 11 Nos. of towers |
| 5 | Stub setting template one set for each tower A & B type |
| 6 | Power Conductor |
| 7 | ACSR Panther Conductor |
| 8 | Disc Insulator Strings complete with all hardware fittings and associated clamps |
| 9 | 10 Disc Twin Tension insulator string (2X10 Discs)-90KN each disc |
| 10 | 10 Disc Single Tension Insulator String(90KN) |
| 11 | 9 Disc Twin Tension insulator string (2X9 Discs)-90KN each disc |
| 12 | 9 Disc Single Suspension Insulator String(90KN) |
| 13 | Jointing sleeves for ACSR panther conductor |
| 14 | Stock Bridge type Vibration Damper |
| 15 | Performed Armoured Rod |
| 16 | Tower and transmission line accessories |
| 17 | Supply of Danger plate |
| 18 | Supply of phase plate |
| 19 | Supply of Number plate |
| 20 | Supply of Bird Guard |
| 21 | Supply of Anti Climbing Device |
| 22 | Tower superstructures |
| 23 | Galvanized lattice steel tower superstructure(approx. HT steel: 30%, MS: 70%) including hangers, gussets, strain plate, step bolts etc. for different tower types.Total 11 Nos of towers |
| 24 | Partially galvanized stub angle with cleat for 11 Nos. of towers |
| 25 | Galvanized iron nuts & bolts, spring washers, step bolts etc for 11 Nos. of towers |
| 26 | Stub setting template one set for each tower A & B type |
| 27 | Power Conductor |
| 28 | ACSR Panther Conductor |
| 29 | Disc Insulator Strings complete with all hardware fittings and associated clamps |
| 30 | 10 Disc Twin Tension insulator string (2X10 Discs)-90KN each disc |
| 31 | 10 Disc Single Tension Insulator String(90KN) |
| 32 | 9 Disc Twin Tension insulator string (2X9 Discs)-90KN each disc |
| 33 | 9 Disc Single Suspension Insulator String(90KN) |
| 34 | Jointing sleeves for ACSR panther conductor |
| 35 | Stock Bridge type Vibration Damper |
| 36 | Performed Armoured Rod |
| 37 | Tower and transmission line accessories |
| 38 | Supply of Danger plate |
| 39 | Supply of phase plate |
| 40 | Supply of Number plate |
| 41 | Supply of Bird Guard |
| 42 | Supply of Anti Climbing Device |
| 43 | Survey |
| 44 | Detail & Check survey as per specification |
| 45 | Construction of RCC foundation for 11 Nos. of different towers including engagement of labours/masons, T&P materials, excavation, shuttering, head loading, back filling etc. complete for handling, placing, levelling, curing etc. complete inclusive of cost of transportation, batching, mixing of cement etc. |
| 46 | Concreting |
| 47 | Reinforcement |
| 48 | Stub setting |
| 49 | Setting of stubs (sets of four) including transportation & distribution of stub and accessories from store to site excluding cost of excavation, concreting & back filling |
| 50 | Erection of superstructure |
| 51 | Superstructure erection including transportation of structures by any means and distribution of structure and accessories from store to site, total 11 Nos. of different towers |
| 52 | Weilding of all nuts & bolts upto the bottom cross arm level including all charges of transportation, materials etc |
| 53 | Stringing |
| 54 | Stringing of power conductors including transportation from stores and distribution of conductors and accessories to sites and laying, stringing, tensioning , clamping, jointing, jumpering and hoisting of insulators complete including cost of all fittings and accessories not specifically mentioned elsewhere per route Km of line |
| 55 | Grounding and other works |
| 56 | Grounding of towers with 3 metre long 25mm dia GI pipe including cost of all materials, such as GI pipes, GI bolts & nuts and washers, salt, cock etc as per specification |
| 57 | Painting of the towers with bituminuous paints of approved quality up to a 3 meters from ground level including the cost of paints |
| 58 | Erection of Danger plates |
| 59 | Erection of Phase plates |
| 60 | Erection of Number plates |
| 61 | Erection of Anti Climbing Device |
| 62 | Erection of bird guard |
| 63 | Arrangement of ERS, erection and dismantling of ERS tower and all necessary associated works involving ERS required for completion of the work (Considering involvement of ERS for 18 times for uniterrupted supply of power) |
| 64 | Supply of OPGW 24-Fibres, Clamps & fittings, junction box with splice kit etc. |
| 65 | OPGW 24-Fibres |
| 66 | OPGW Tension double dead end set with splice location |
| 67 | OPGW Suspension double dead end set without splice location |
| 68 | OPGW vibration damper c/w performed armour rods |
| 69 | OPGW downlead clamps |
| 70 | OPGW slicing kit with junction box |
| 71 | Installation & Restringing of OPGW |
| 72 | Dismantling of OPGW, Vibration Damper. Tension/Suspension |
| 73 | Stringing of OPGW-24 Fibres |
| 74 | Installation of Tension/suspension assembly fittings |
| 75 | Installation of vibration dampers |
| 76 | Installation of downlead clamps |
| 77 | Splicing/jointing work including testing of fibres |
| 78 | Opening and lowering of conductors from the portion of the line to be dismantled (3-conductors) and transportation to the AEGCL store |
| 79 | Dismantling of towers without damaging the members and transportation to the AEGCL store with proper staking Please Enable Macros to View BoQ information |