| 1 | Removal of filter media sand, pebbles and gravels from the Multigrade pressure sand filter mannually @ WTP Latur. |
| 2 | Screening of filter media pebbles and gravels from the filter media sand and again laying in proper gradation in the sand filter @WTP Etc complete. |
| 3 | Dismantling of lateral pipes and replacing of damaged pipes by new one in MGF from existing location by removing of flanged ends, gas cutting of bolts if necessary etc complete. |
| 4 | Replacement of damaged air vent pipe of the MGF along with the valve assemby. |
| 5 | Replacement of BF valves for inlet and backwash side for MGF & ACF |
| 6 | Replacement of Lamella plates damaged due to weathering effect. |
| 7 | Replacement of sludge sampling valves along with the pipes to collect sludge samples. |
| 8 | Labour charges for retro fitting of the MGF… with new set of gaskets for top and bottom, hydra charges, nut bolts etc complete. |
| 9 | Repairs to Reduction gear box and stirrer of SMFT and balancing of SS shaft |
| 10 | Replacement of Shaft socket of SMFT |
| 11 | Online Chemical dosing pump @12 ltr / hr @ 4 Kg pressure |
| 12 | Supply & top up refill of fresh Activated carbon filter media along with removal of old media. |
| 13 | Making surface completely chemical free from soaked chemicals by NF cleaner 9111 of BELZONA make to receive new cement plaster as per detail specifications and as directed by engineer in charge etc. complete. |
| 14 | Providing and applying final well mixed BELZONA 5811 DW2 Magma Immersion Grade two coats by mixing solidifier with base material as per detail specifications and as directed by engineer in charge etc. complete. |
| 15 | Cleaning the pipe surface using solutionizers,enumerated below by removing all scales loose particles by manually with brush or power tools required etc and preparing the surface for receiving the paint (Rates excluding GST). |
| 16 | Providing and applying Epoxy Primer Grey a two component primer containing pigments having good adhesion & corrosion resistant to prepare the surface prior to application of Epoxy Coating, including all costs of labour and material as per directions of engineers in charge etc. complete. |
| 17 | \\"Providing and applying two coats of EP-NPC-555 which is a special formulated high performance heavy duty two component high build phenolic plus epoxy resin based cured with amine. This is a two component mix & provides excellent protection against environmental corrosion agents & its tough film providers resistance to acids, alkalis, oil, greas and atmospheric conditions, including all costs of labour and material as per directions of eng neers in charge etc. complete.\\" |
| 18 | Augumentation, repairs with software upgradation of flow converter transmitter at various locations on water supply line |
| 19 | Supply of double shielded signal cable for full bore electromagnetic flow meter |
| 20 | Testing and calibration of flowmeter upto 900 dia by clamp on portable type flowmeter at site includes following SOPs and traceble documentation, consult on calibration methods on frequencies, proactively identify potential instrument issues, our calibration method will improve calibration planning and at the same time satisfy the requirement of customers by providing traceable and audiblr recordings |
| 21 | Providing and supplying INDFLOC 238 (Cationic polymer) as per detailed specifications of the agreement etc complete including all transportation, loading and unloading etc complete at WTP Latur for 1 yrs |
| 22 | Providing and supplying INDFLOC 3020 (Anionic polymer) as per detailed specifications of the agreement etc complete including all transportation, loading and unloading etc complete at WTP Latur |
| 23 | Supply, errecting, testing and commissioning of LT cubical pannelsuitable for ON/OFF operation of pumps, chemical dosing pumps, stirrer of SMFT etc complete for smooth operation of the system along with Automation system along with all sensors required for the system for smooth operation along with all wiring, electrodes, sensors, signalling calbles, installation and fitting complete Please Enable Macros to View BoQ information |