| 1 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 2 | OD530525/2025-2026:Demolishing laterite work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar |
| 3 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 4 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil |
| 5 | OD501301/2025-2026:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil (3 m to 4.5 m) |
| 6 | OD501300/2025-2026:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil (4.5 m to 6 m) |
| 7 | OD501299/2025-2026:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil (6 m to 7.5 m) |
| 8 | OD472767/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x23x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.(modified 50.6.7.1 for well ) |
| 9 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. |
| 10 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining |
| 11 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 12 | 50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 13 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 14 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 15 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 16 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 17 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work Please Enable Macros to View BoQ information |