| 1 | CONSTRUCTION OF CHECK DAM |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 3 | 2.7.2:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (requiring blasting) |
| 4 | 60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. |
| 5 | 60.2.3:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete |
| 6 | 60.5.3:DOWEL BARS - Supplying and Providing MS dowel bars of size 25 mm dia of 2.0m long (1m in rock and 1m in concrete ) including drilling holes of 30mm dia and filling the gap with cement grout( 0.50kg/each) etc complete |
| 7 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 9 | 60.63.2:FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental .officers. |
| 10 | 60.63.1:FRP SHUTTERS - Supplying and fixing FRP Channels of \\"C\\" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers. |
| 11 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 12 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 13 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes |
| 14 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. |
| 15 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 16 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring |
| 17 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. |
| 18 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. |
| 19 | 56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. |
| 20 | 56.7:Conducting standard penetration test in bore hole at any depth. |
| 21 | 56.11.c:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos. |
| 22 | 60.7.4:DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 23 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. |
| 24 | CONSTRUCTION OF BRIDGE |
| 25 | 14.1B.2.1.A:Furnishing and Placing Reinforced Cement Concrete Grade M25 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For solid slab super-structure - Height up to 5m |
| 26 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br> |
| 27 | 13.5.B:Plain/Reinforced Cement Concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M20 - Height upto 5m |
| 28 | 12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br> |
| 29 | 13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications |
| 30 | 14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 31 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications |
| 32 | 14.4:Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. |
| 33 | 14.11:Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. |
| 34 | 14.7:Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, center to center spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. |
| 35 | OD52173/2025-2026:Supplying, fitting and fixing in position true to line and level Tar paper bearing conforming toIRC:83-2018 of MoRTH specifications 10 mm thick, including all accessories as per drawingand Technical Specifications. Please Enable Macros to View BoQ information |