|
| 1 | Part-I 11 KV DP Without AB Switch |
| 2 | WPB (GI) Pole 160x152 (13Mtr. Long, 30.44KG/Mtr.)-DP |
| 3 | Top Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 2.3 mtr., 2 no's Channel(GI) required =( 2x9.56x2.3) |
| 4 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 5 | Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 1.66 Mtr., 4 no's Channel(GI) required =( 7.14x1.66x4) |
| 6 | 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 2.671 mtr., 4 nos Angle(GI) required = (4.5x2.671x4) |
| 7 | Danger Plate, 2 no's. |
| 8 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 9 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 10 | H.T. Stay set (Complete ) |
| 11 | H.T. Stay Insulator Type-C |
| 12 | 7/10 SWG Stay Wire 15kg /stay |
| 13 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 14 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 5x2.36 |
| 15 | GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 16 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 17 | 11 KV pin insulator polymer |
| 18 | H W fitting(B&S) 70KN, 3Bolt |
| 19 | Disc insulator (B&S) 70 KN polymer |
| 20 | NON METALLIC TIES-11KV 80 SQMM.CONDUCTOR AAAC |
| 21 | IPC FOR 80 SQMM.AAA CONDUCTOR(For covered conductor)-11KV |
| 22 | Spike(GI)(Using 50x6mm flat(GI) welded with 8 mm square bar)(2 nos of spike per set in each pole) |
| 23 | GI Nut , Bolt & Washer of different sizes (12.261 Kg each DP without AB Switch) |
| 24 | Black Paint(GIS Numbering & Zebra Stripping) |
| 25 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 26 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 27 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 28 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 29 | Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design |
| 30 | Part -II Construction of 25 KVA s/s with WPB (GI) Pole 160x152 (13Mtr. Long, 30.44KG/Mtr.) -1 no (without transformer) |
| 31 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.65 KG+10.74 KG= 345.58 KG) |
| 32 | 9 Mtr. long 300 Kg. PSC Pole |
| 33 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 34 | EYE hook for XLPE Aerial bunched Cable |
| 35 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 36 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg) |
| 37 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 38 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 39 | M.U Channel(GI) GI 75x40x4.8 mm (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 40 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 41 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35) |
| 42 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 43 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 44 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 45 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 46 | Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 47 | Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 48 | Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 49 | Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 50 | LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 51 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 52 | LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 25 KVA S/S |
| 53 | 55mm2 AAA XLPE Covered conductor |
| 54 | 4 Cx 35 mm2 LT XLPE Cable(Armoured) - FOR 25 KVA Trf. |
| 55 | 4 Cx 35 mm2 LT XLPE Cable(Armoured) - From LTDB to PSC Pole |
| 56 | AB Switch(11KV,200A.3pole,50Hz) |
| 57 | H.G.Fuse( 11KV.200A.3Pole) |
| 58 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 59 | POLYCARBONATE BIRD GUARD |
| 60 | Disc insulator (B&S)70 KN polymer |
| 61 | H W fitting (B&S)70KN(3bolted) |
| 62 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 63 | 11KV pin insulator polymer |
| 64 | HT stay set complete |
| 65 | HT stay Clamp (1.9Kg/pair) |
| 66 | HT stay insulator TYPE-C |
| 67 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 68 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 69 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 70 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 71 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 72 | Danger plate 11kv |
| 73 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 74 | Name plate |
| 75 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 76 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 77 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole) (For WPB Pole) |
| 78 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 79 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)= 1.5 Cu. mtr. |
| 80 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 81 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 82 | Laying of 4 Cx 35 mm2 LT XLPE Cable |
| 83 | SITC and Erection of GI Fencing with Gate |
| 84 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) (For PSC Pole) |
| 85 | Supply of AL Lugs suitable for 35 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 86 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 16-35sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 87 | Part-III 11 KV Cut Point with 90 Degree Angle |
| 88 | PSC POLE 10 METER LONG 330 KG. |
| 89 | PSC Pole Clamp(GI) |
| 90 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 91 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 92 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306) |
| 93 | Danger Plate, 1 no's. |
| 94 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 95 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 96 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 97 | 11 KV pin insulator polymer |
| 98 | H W fitting(B&S) 70KN, 3Bolt |
| 99 | Disc insulator (B&S) 70 KN polymer |
| 100 | Earthing of Support ( Coil Type ) |
| 101 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 102 | NON METALLIC TIES-11KV 80 SQMM.CONDUCTOR AAAC |
| 103 | IPC FOR 80 SQMM.AAA CONDUCTOR(For covered conductor)-11KV |
| 104 | Spike(GI)(Using 50x6mm flat(GI) welded with 8 mm square bar)(2 nos of spike per set in each pole) |
| 105 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 106 | H.T. Stay set (Complete ) |
| 107 | H.T. Stay Insulator Type-C |
| 108 | 7/10 SWG Stay Wire 15kg /stay |
| 109 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 110 | Black Paint(GIS Numbering & Zebra Stripping) |
| 111 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 112 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 113 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr (For 11Mtr. WPB Pole) |
| 114 | Part-IV 11 KV Pin Points With PSC pole |
| 115 | PSC POLE 10 METER LONG 330 KG. |
| 116 | PSC Pole Clamp(GI) |
| 117 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 118 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 119 | Danger Plate, 1 no's. for each pole |
| 120 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 121 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 122 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 123 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 124 | Earthing of Support ( Coil Type ) |
| 125 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 126 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 127 | 80 sq.mm XLPE Insulared AAA conductor |
| 128 | Black Paint(GIS Numbering & Zebra Stripping) |
| 129 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 130 | MID SPAN JOINT FOR 11KV 80 SQMM CVRD AAAC |
| 131 | NON METALLIC TIES- 11KV 80 SQMM CVRD AAAC |
| 132 | Spike(GI)(Using 50x6mm flat(GI) welded with 8 mm square bar)(2 nos of spike per set in each pole) |
| 133 | Concreting ratio 1:1.5:3 (M-20 GRADE ) (500X500C1800MM)= 0.45 Cu.mtr (For 11 Mtr. WPB Pole) |
| 134 | Part-V LT Line using PSC POLE |
| 135 | 9 Mtr. long 300 Kg. PSC Pole |
| 136 | WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.65 KG+10.74 KG= 345.58 KG) |
| 137 | LT Stay set Complete |
| 138 | 7/12 SWG GI stay wire, Grade -2 |
| 139 | LT stay Clamp ( 1.40Kg/pair) |
| 140 | LT Stay insulator |
| 141 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 142 | EYE hook for XLPE Aerial bunched Cable |
| 143 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 144 | Suspension Clamp with EYE hook for ABC |
| 145 | 4C×35 mm² (P)+1C×35 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 146 | Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm |
| 147 | GI Pipe Earthing (each 5th pole to earth) |
| 148 | Coil Earthing |
| 149 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 150 | Danger plate (LT) |
| 151 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 152 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 153 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 154 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 155 | Black Paint(GIS Numbering & Zebra Stripping) |
| 156 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 157 | Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 158 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) |
| 159 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 160 | Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole) |
| 161 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 162 | Part-VI Dismantling part(To be executed by Party) |
| 163 | Dismantling of 11/13 Mtr. Joist/WPB Pole- 150X150 mm/ 160X160 mm |
| 164 | Dismantling of 9/8 Mtr. PCC/Joist Pole |
| 165 | Dismantling / Removal of V Cross arm from pole |
| 166 | Dismantling of 11kV Pin Insulator with Pin |
| 167 | Dismantling of 11kV Disc Insulator with Hardware |
| 168 | Dismantling / Removal of MS Channel. from Double Pole Structure /pole |
| 169 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 25KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 170 | Dismantling of ACSR/AAAC 80/100 mm2 from overhead line |
| 171 | Dismantling of varous size of LT AB Cable |
| 172 | Dismantling of 11 kV /33KV GO/AB Switch/Isolator/DD fuse/fuse set |
| 173 | Erection of re used 25 kva transformer Please Enable Macros to View BoQ information |