|
| 1 | Group-AExcavtion in soil using Hydraulic Excavator and Toppers with disposal upto 1000m Excavtion for roadwork in soil with hydraculic excavator of 0.9 cum bucket capacity inculiding cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and trasporting to the embankment location with a lift upto 1.5m amd lead upto 1000m as per technical Specifcation clause 302.3 |
| 2 | Construction of embankment with approved materials obtained from roadway CuttingConstruction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 |
| 3 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site. spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1 (3.14) |
| 4 | Providing, laying and spreading Material on prepared sub grade, adding cement 43 grade OPC @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. Granular Sub-Base with Coarse Graded Material (Cement Treated Subbase) |
| 5 | Providing, laying and spreading Material on prepared sub grade, adding cement @4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base Cement treeted Base |
| 6 | Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated cleaned by air compressor as per Technical Specification Clause 503 |
| 7 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates and using (VG-10) bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical specification clauses 508. |
| 8 | Providing, laying seal coat by means with VG-10 Bitumen sealing the void in a bituminous surface laid to the specified levels grade cross fall usingType C as per Technical specification clauses 510. |
| 9 | Group- BExcavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. |
| 10 | Supply & Laying of 350mm dia NP-3 HP and their cartage etc including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges and as per approved drawing. |
| 11 | Supply & Laying of 600mm dia NP-3 HP and their cartage etc including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges and as per approved drawing. |
| 12 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.s including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges and as per approved drawing. |
| 13 | Brick work with commomn burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortor 1:4 (1 cement : 4 coarse sand as per DSR 6.1.1 |
| 14 | Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 coarse sand) :Raised and cut pointing Ch- 13 Si No- 1. including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges and as per approved drawing. |
| 15 | Plain Cement Concrete (PCC Grade M15 ) in Open Foundation complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100 including cost of all materials from approved quarry, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges |
| 16 | Part-AMaintainance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. (Total Amount for PC Work Sl No. 1 to 8 = 8888380.00) |
| 17 | Part-BMaintainance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. (Total Amount for Puliya Sl No. 9 to 15 = 322491.50) |
| 18 | Maintainance of First Year(@ 0.00% of Total Work Amount of item 1 to 8) |
| 19 | Maintainance of First Year(@ 0.00% of Total Work Amount of item 9 to 15) |
| 20 | Maintainance of Second Year (@ 0.75% of Total Work Amount of item 1 to 8) |
| 21 | Maintainance of Second Year (@ 0.25% of Total Work Amount of item 9 to 15) |
| 22 | Maintainance of Third Year (@ 1.50% of Total Work Amount of item 1 to 8) |
| 23 | Maintainance of Third Year (@ 0.50% of Total Work Amount of item 9 to 15) |
| 24 | Maintainance of Fourth Year (@ 2.25% of Total Work Amount of item 1 to 8) |
| 25 | Maintainance of Fourth Year (@ 0.75% of Total Work Amount of item 9 to 15) |
| 26 | Maintainance of Fourth Year (@ 1% of Total Work Amount of item 1 to 8) |
| 27 | Maintainance of Fifth Year (@ 1% of Total Work Amount of item 9 to 15) Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3- Maintenance will be calculated on value of actual work done. Please Enable Macros to View BoQ information |