| 1 | Item Wise BoQ BoQ_Ver3.0 Item Wise Normal INR Only INR Select, Excess (+), Less (-) Tender Inviting Authority: Executive Engineer,Hydel Obra Power Station Division, Obra Name of Work: Complete inspection, testing and major overhauling of two no.100/20 Ton Electric Overhead Traction (EOT) crane of (3x33MW) Hydel Obra Power Station, Obra, Sonebhadra. Contract No: T-55/HOPS/2025-26 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER NUMBER TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Name of the items/Particulars Item Code / Make Quantity Units Estimated Rate MAKE (For Supply) Addition / Deduction Nature of Electrical Currency Convertion against each Item Quoted Currency in INR BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty (If Applicable) (in. Rs.) GST (If Applicable) (In Rs.) VAT/ CST/ Sales Tax (in. Rs.) Freight & Transit Insurance Charges (in. Rs.) P&F Charges(in. Rs.) IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes per item TOTAL AMOUNT Without Taxes TOTAL AMOUNT In Words (GST shall be paid extra) |
| 2 | Overhauling and testing of all five motors (two for long travell, one for cross travell, one for main hoist and one for auxilliary hoist) in one crane as per scope of work, complete in all respect. |
| 3 | Alignment, levelling of complete rail track after repairing of crane as per scope of work. |
| 4 | Overhauling of all gearboxes of both the crane as per scope of work. |
| 5 | Supply, testing and commissioning of one no. Thruster motor & brake system for Main hoist of one crane. |
| 6 | Supply, testing and commissioning of one no. Thruster motor & brake system for Aux hoist. |
| 7 | Repairing of the greasing system of both the crane as per scope of work. |
| 8 | Overhauling of all the wheels of both the crane as per scope of work. |
| 9 | Cleaning, repair and maintenance complete Bus Bar of both the crane as per scope of work. |
| 10 | Cleaning of complete crane with compressed air as per scope of work. |
| 11 | Overhauling of all 04 snatch block of 100 ton and 25 Ton respectively of both the crane. |
| 12 | Supply, installation tetsting and commissioning of 02 step radio remote controller set for main hoist, auxiliary hoist and tandom operation along with complete parts viz remote, receiver, transmitter, decoder etc. for both the crane. |
| 13 | Supply and installation of Digital/analog Level indicator of common coupling beam of both crane of capacity 100 Ton each. |
| 14 | Supply, installation, testing and commisssioning of Safe Load Indicator of both the EOT Crane of capacity 100/25 Ton each. |
| 15 | Complete cleaning, servicing and replacement of faulty component of all electrical panels along with supply of mandatory electrical spares of per scope of work. |
| 16 | Complete retrofitting, rewiring of ligting system of both the crane including operator cabin, fixing of new flood lights, retrofitting of operator cabin of both the EOT crane as per scope of work. |
| 17 | Complete painting of the both the crane with coupling beam, T-G shaft guard, T-G shaft cover plate, Turbine lifting device as per scope of work. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only NOTE: Additional performance security will have to be furnished by the successful bidder, in case of unbalanced bid as per G.O. no. 622/23-12-2012-2 Audit /08, T.C.-2, Lucknow dated 08/06/2012 which is as follows: a) If the bid is up to 10% below the estimated cost, the additional performance security is 0.50% for each 1% below the rates quoted by the bidder. b) If the bid is more than 10% below the estimated cost, the additional performance security is 1% for each 1% below the rates quoted by the bidder. Please Enable Macros to View BoQ information |