| 1 | Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 3 | Construction of granular sub-base by providing well graded material from approved quarry, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 4 | Providing ,Laying ,spreading Material on prepared sub grade ,adding cement @2% by weight to the spread material manually ,mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub-base. . Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 5 | Providing ,Laying ,spreading Material on prepared sub grade ,adding cement @ 4% by weight to the spread material manually ,mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of base.Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 6 | Construction of shoulder with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 7 | Providing and applying tack coat with Bitumen V.G._10 using Bitumin pressure distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom . Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 8 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates from Kabrai quarry with using VG_10 @ 1.46 Kg per Sqm bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 9 | Providing and laying seal coat composed of 6.7 mm aggregates from Kabrai quarry with using VG_10 @ 0.65 Kg per Sqm bitumen to required sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type 'C'. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 10 | Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density Including all material, labour & T&P with all taxes etc. complete but excluding GST. |
| 11 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 Including all material, labour & T&P with all taxes etc. complete but excluding GST. |
| 12 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. As per mord Spe-800 Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 13 | Providing,laying and fixing of reinforced concrete pipe 600 mm dia NP3 for culvert on first class bedding of granular material in single row with cement mortar1:2(1cement: 2 coarse sand) [as per MORD specification no. 9.3-1100(B)] Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 14 | Providing,laying and fixing of reinforced concrete pipe 450 mm dia NP3 for culvert on first class bedding of granular material in single row with cement mortar1:2(1cement: 2 coarse sand) [as per MORD specification no. 9.3-1100(B)] Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 15 | Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 16 | Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 17 | Dismentiling of existing structures like culverts,bridges,retaining walls and other structure comprising of masonry,cement concrete,wood work,steel work,including T&p and scaffolding wherever necessary,sorting the dismanted material,disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m asper Technical specification Clause 202. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 18 | Providing concrete for Plain/reinforced concrete in open foundations complete as per drawing and technical specifications clauses 802,803, 1202.& 1203.RCC Grade M-25. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 19 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5.RCC Grade M-25. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 20 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 21 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia pvc pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications Clauses 614,709,1204.3.7. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 22 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 23 | Drainage Spouts complete as per drawing and Technical specification Clause 1209. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 24 | Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5. Including all material, labour & T&P with all taxes etc. complete but excluding GST |
| 25 | Plastering with cement mortar (1:3) in substructure/superstracutre as per technical specification. Including all material, labour & T&P with all taxes etc. complete but excluding GST Please Enable Macros to View BoQ information |