| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300.2 with lead up to 1000m as per technical specification clause 301.5 |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density as per MORD specification 401 |
| 4 | Providing ,Laying and spreading material on a prepared sub-base, cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. |
| 5 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 to 0.40 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 6 | Providing, laying and rolling of open - graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in HMP, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.as per Technical Specification clause 508. |
| 7 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type 'C' as per Technical Specification clause 510. |
| 8 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 9 | Construction of 300mm dia NP3 H.P. culvert Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets |
| 10 | Construction of 600mm dia NP3 H.P. culvert Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. |
| 11 | P.C.C grade M 10 (i)Nominal mix 1:3:6 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
| 12 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1 202 & 1 203 II. Brick masonry in 1:4 cement mortar |
| 13 | Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 |
| 14 | PIastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1 204 Please Enable Macros to View BoQ information |