| 1 | Construction of Subgrade and earthen shoulders with apporved material obtained from borrow pits with attl ifts and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 with a lead upto 1000 m as per Tecnical Specification Clause 303.1 including all Taxes but Excluding cost of GST. |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/ tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth MORD Specific - ations 401 including all Taxes but Excluding cost of GST. |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, a MORD Specific - ations 405.3 |
| 4 | Providing laying & Spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to from a layer of Sub-Base including all Taxes but Excluding cost of GST. |
| 5 | Providing, treated, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manaully, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base including all Taxes but Excluding cost of GST. |
| 6 | Providing and applying Tack coat with VG-10 Bitumen over Bituminous surface at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic ar per Technical Specification Clause 503 including all Taxes but Excluding cost of GST. |
| 7 | Providing laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finish to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508 including all Taxes but Excluding cost of GST. |
| 8 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 including all Taxes but Excluding cost of GST. |
| 9 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 including all Taxes but Excluding cost of GST. |
| 10 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (P.C.C M-10) including all Taxes but Excluding cost of GST. |
| 11 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (R.C.C M-20) including all Taxes but Excluding cost of GST. |
| 12 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (R.C.C M-25) including all Taxes but Excluding cost of GST. |
| 13 | Brick masonry work in cement mortar in foundation complete excepting pointing and plastering, as per drawing and technical specification Clauses 600, 1202 & 1203 including all Taxes but Excluding cost of GST. |
| 14 | Pointing with cement mortar (1:3) on brick work, as per drawing and technical specification Clauses 613.3 and 1204 |
| 15 | Supply Laying of NP-3 Hume 350 mm dia in position joining with cement including cost of collar pipe and all material etc including all Taxes but Excluding cost of GST. |
| 16 | Supply Laying of NP-3 Hume 600 mm dia in position joining with cement including cost of collar pipe and all material etc including all Taxes but Excluding cost of GST. |
| 17 | Supply Laying of NP-3 Hume 1000 mm dia in position joining with cement including cost of collar pipe and all material etc including all Taxes but Excluding cost of GST. |
| 18 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 including all Taxes but Excluding cost of GST. |
| 19 | Providing & fixing of Km Stone including cost of all material including all Taxes but Excluding cost of GST. |
| 20 | Providing & fixing of Hec. Stone including cost of all material including all Taxes but Excluding cost of GST. |
| 21 | Construction of un-reinforced plain cement concrete pavement, thickness as per design over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 Grade coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side frame work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the framework as per drawing), spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continious operation including provision of contraction and expansion, construction joints by providing 12mm thick dura board at the specified spacing, applying debonding strips primer, with MS dowel bar sealant near approaches to bridge/culvert and construction joints admixtures as approved, curing of concrete slabs for 14-days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 but including cost of polythene sheet and also including all Taxes but Excluding cost of GST. |
| 22 | Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 including all Taxes but Excluding cost of GST. |
| 23 | Providing and laying of cement concrete interlocking Brick (Rubber Moulded) having thickness 80 mm (30mpa) as per drawing and technical specifications Clause 1504. |
| 24 | Maintenance of constructed road next five year after completion the contractor shall be paid total maintenance cost 2.5% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST)For 1st Year 0.00% |
| 25 | Item No.21 but for 2nd year 0.25% |
| 26 | Item No. 21 but for 3rd year 0.50% |
| 27 | Item No. 21 but for 4th year 0.75% |
| 28 | Item No. 21 but for 5th year 1.00% |
| 29 | Maintenance of constructed road next five year after completion the contractor shall be paid total maintenance cost 15% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST)For 1st Year 0.00% |
| 30 | Item No.22 but for 2nd year 0.75% |
| 31 | Item No. 22 but for 3rd year 1.50% |
| 32 | Item No. 22 but for 4th year 2.25% |
| 33 | Item No. 22 but for 5th year 3.00% Please Enable Macros to View BoQ information |