|
| 1 | Site clearence..etc |
| 2 | Excavation in foundation in ordinary soil 1.5m depth ..etc |
| 3 | E/W cutting & filling ordinary soil i/c labour T&P….etc complete. Cartage upto 6km. Distance. |
| 4 | Concrete with 4cm(1½\\"). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all materials, Iabour and T&P etc. required for proper completion of the work. |
| 5 | M 150 class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 6 | As in item 283 above but in R.C.C. Raft foundation and footing with 4 cm. (1½')gauge approved stone ballast. |
| 7 | As in item (283) above but in the lighter beams i.e. having spans above 6 m. |
| 8 | M 150 class brick work in 1:4 cement and coarse sand mortar in super structure including supply of all materials, labour and T&P etc. required for proper completion of the work.As in item 314 above but in jack arches including shuttering and centering add extra labour in item no. 303-307. |
| 9 | As in item (283) above but in R.C.C. T-beam and slab roofs and R.C.C. columns. |
| 10 | 12mm Thick plaster with cement mortar in proportion of 1:4 cement and fine sand of 1.25 FM over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper comletion of the work. (including racking & washing surface) |
| 11 | Cement concrete with 4 cm. (1½\\") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 12 | P/A Apex exterior paint 2more coat new plaster work incl. 2coat birla putty…..etc all work complete. |
| 13 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. |
| 14 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. |
| 15 | Supply and fixing of flush Doors commercial quality conforming to I.S. 2202 Part I (1983) including fixing of wooden cleats and stoppers and including fixing and adjustment of hinges bolts locks handles springs fitting with necessary screws to be supplied departmentally.(iii) 40 mm thick |
| 16 | Electrification ….work. |
| 17 | S/Fixing of sign board |
| 18 | Add 18% GST Charge Please Enable Macros to View BoQ information |