| 1 | O.MS/FEN-IIT.01.01Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding literate or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, leveling, dressing and ramming the bottom, bailing out water as required completea) Depth of excavation not exceeding 1,500 mm |
| 2 | Ordinary Cement concrete (mix 1:2:4) with graded stonechips (20 mm nominal size) excluding shuttering andreinforcement, if any, in ground floor as per relevant IS codes |
| 3 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 4 | Hire and labour charges for shuttering with centering andnecessary staging upto 4 m using approved stout props andthick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof)C) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. |
| 5 | M.S. structural works with hollow sections (square orrectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arcwelding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete.The rate includes the cost of all M.S. Hollow section, allconsumables such as electrodes, gas and hire charges of alltools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete.Payment to be made on the basis of calculated weight ofstructural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. |
| 6 | Supplying fitting and fixing I.R.C. fabric mesh with covering battens including cost of screws etc complete (excluding the cost of battens).In ground floor.(b) 75mm x 25mm x 4.5mm x 2.7mm. |
| 7 | (b) Priming one coat on steel or other metal surface withsynthetic oil bound primer of approved quality includingsmoothening surfaces by sand papering etc. |
| 8 | (A) Painting with best quality synthetic enamel paint ofapproved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessaryOn steel or other metal surfaceWith super gloss (hi-gloss) -Two coats (with any shade except white |
| 9 | Hire and Lobour charges of JCB including fuel charges as per direction of EIC |
| 10 | Surface Dressing of the ground in any kind of soilincluding removing vegetation inequalities notexceeding 15 cm depth and disposal of the rubbishwithin a lead up to 75 m as directed. |
| 11 | Add CGST @9% of total amount to Rs.10,82,547.77 |
| 12 | Add SGST @9% of total amount to Rs.10,82,547.77 |
| 13 | Add Construction Cess @1% of total amount to Rs.10,82,547.77 Please Enable Macros to View BoQ information |