| 1 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc.A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricksincluding ramming and dressing bed to proper level and filling jointswith local sand |
| 2 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B.CONCRETE WORKS 1. Cement concrete with graded jhama khoa(30 mm size) excluding shuttering In ground floor and foundation (a)1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018) |
| 3 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36.Hire andlabour charges for shuttering with centering and necessary stagingupto 4 m using approved stout props and thick hard wood planks ofapproved thickness with required bracing for concrete slabs, beamsand columns, lintels curved or straight including fitting, fixing andstriking out after completion of works (upto roof of groundfloor).(When the height of a particular floor is more than 4 m theequivalent floor height shall be taken as 4 m and extra for worksbeyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 mor part thereof).(c) Steel shuttering or 9 to 12 mm thick approvedquality ply board shuttering in any concrete work |
| 4 | 35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc.Rounding off corners, chequering as required including takingnecessary protective measure complete in Gr.floor/footpathwith graded stone chips 11.2mm down,properly leveled with 3mmthick screen on top by cement slurry [email protected] cement per Sqm |
| 5 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADEDSTONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDINGSHUTTERING AND REINFORCEMENT, IF ANY, IN GROUNDFLOOR AS PER RELEVANT IS CODES (BASED ON PWDSCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDADT.04.06.2018) |
| 6 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICKWORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b)In superstructure, ground floor |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICKWORKS 17. 125 mm. thick brick work with 1st class bricks in cementmortar (1:3) in ground floor. |
| 8 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor,ceiling etc.) with sand and cement mortar including rounding off orchamfering corners as directed and raking out joints includingthroating, nosing and drip course, scaffolding/staging wherenecessary (Ground floor).[Excluding cost of chipping over concretesurface](iii) With 1:3 cement mortar (a) 20 mm thick plaster |
| 9 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH,COLOUR WASH, DISTEMPER B. MISCELLANEOUS ITEMS 5(a)Rendering the Surface of walls and ceiling with White Cementbase WATER PROOF wall putty of approved make & brand.(1.5 mmthick) |
| 10 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 31.Supplying, fitting & fixing granite tiles 10mm to 12mm. thick incolumns, wall, facia etc. with 15 thick [avg] cement mortar (1:2)including making suitable arrangements to hold the stones properlyby brass / copper hooks including pointing in cement mortar (1:2) (1white cement : 2 marble dust) with admixture of pigment matching thestone shades all complete as per direction of the Engineer-in-chargeincluding cost of all materials, labours, scaffolding, staging ,curingand roughening of concrete surface complete. [Using cement slurry atback side of tiles@ 4.4 kg/sq.m & white cement slurry for joint filling@ 1.8 kg/sq.m] Area of each slab upto 0.2 Sq.m. (Add extra for eachaddl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 ofsubhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m (II) above 4th floor-Rs. 16/- per Sq.m |
| 11 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 34.Supplying,fitting & fixing granite slab 15mm to 18mm thick in floor,lobby, stair, landing and treads etc. over 20mm (avg) thick base ofcement morter (1:2) laid with white cement slurry @ 4.40Kg perSquare meter before placing of granite and jointed with white cementslurry @ 2.0 Kg per square meter with necessary pigments andcomplete as per direction of Engineer-in-charge including cost of allmaterials, labours, curing and roughening of concrete surfacecomplete. In ground floor (c) Area of each Granite slab above 1.00 Square meter. Add extra for each addl, floor over the rate for itemA(33, 34) I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs.16/- per Sq.m |
| 12 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punningabout 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement0.152 cu.m per100 sq.m. |
| 13 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,GATES ETC. A. ORIGINAL WORKS 16. M.S. gate of Jail type as perapproved design made of strong M.S. frame work, intermediatestiffeners and round / square bars or angles. M.S. sheet (not lessthan 14 gauge) gussets, cleats etc. including necessary riveting,bolting, welding, locking and hanging arrangements, fitting and fixingcomplete as per direction of the Engineer-in -charge. In ground floor.(Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% foreach addl. floor above 4th floor) (Portion of locking arrangementinside the wal to be paid separately) |
| 14 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH,COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 ApplyingExterior grade Acrylic primer of approved quality and brand onplastered or cencrete surface old or new surface to receive decorativetextured (matt finish) or smooth finish acrylic exterior emulsion paintincluding scraping and preparing the surface throughly, complete asper manufacturer's specification and as per direction of the EIC. InGround Floor: (b) Two Coats [This item to be done under specificinstruction of the Superintending Engineer]N.B.:-Extra for eachadditional floor in external walls refer item 1 of subhead C |
| 15 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH,COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 17 Protectiveand Decorative Acrylic exterior emulsion paint of approved quality, asper manufacturer's specification and as per direction ofEngineer-in-Charge to be applied over acrylic primer as required. Therate includes cost of material, labour, scaffolding and all incidentalcharges but excluding the cost of primer. In Ground floor (Two Coat)b) Premium 100% Acrylic Emulsion N.B. The items [17 (b) & 17(c)] ofsubhead A are to be selected only with written permission ofSuperintending Engineer for very resticted and small areas of abuilding. |
| 16 | GST 18% |
| 17 | Cess 1% Please Enable Macros to View BoQ information |