| 1 | DISMANTLING OF NUT & BOLT WASHER ETC OF TOP COVERFROM LOWER HALF CASING OF PUMP AND KEPT IT SUITABLE PLACE AS PER DIRECTION OF THE EIC. |
| 2 | DISMANTLING THE BEARING HOUSING AT BOTH END &DECOUPLING BOTH FROM PUMP MOTOR UNIT AND LIFTING THE TOTAL ROTATING ASSEMBLY & KEEP IT AT A SUITABLE PLACE AS PER DIRECTION OF THE EIC. |
| 3 | DISMANTLING THE ALL PART OF THE ROTATING ASSEMBLYONE BY ONE SUCH AS COUPLING UNIT OF PUMP SIDE &BEARING, SLEEVE, SLEEVE NUT AT BOTH END ETC.INCLUDING TO AND FRO TRANSPORTATION, LOADING, UNLOADING ETC. AS PER DIRECTION OF THE EIC. |
| 4 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITHNECESSARY MACHINING & FINISHING OF SHAFT SLEEVEMADE OF SS 410 IN RESPECT OF THE ROTATING ASSEMBLYAS PER SAMPLE AND DIRECTION OF THE EIC. |
| 5 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITHNECESSARY MACHINING & FINISHING OF BUSH FORCOUPLING OF PUMP-MOTOR MADE OF NEOPRENE RUBBER IN RESPECT OF THE ROTATING ASSEMBLY AS PER SAMPLE AND DIRECTION OF EIC. |
| 6 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITHNECESSARY MACHINING & FINISHING OF COUPLING BOLTWITH NUT MADE OF HT STEEL IN RESPECT OF THE ROTATING ASSEMBLY AS PER SAMPLE AND DIRECTION OF EIC. |
| 7 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITHNECESSARY MACHINING & FINISHING OF NUT, BOLT &WASHER FOR TOP & BOTTOM CASING MADE OF HT STEEL AS PER SAMPLE AND DIRECTION OF EIC. |
| 8 | Supply and delivery of the following bearing (Make: SKF):NU322ECM |
| 9 | SUPPLY, DELIVERY, FITTING AND FIXING OF SKF MAKEBEARING NO 7322 BECBM FOR 24UPH3 PUMP AT CWPS-II,GRWW. |
| 10 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITHNECESSARY MACHINING & FINISHING OF SLEEVE NUT/JAMNUT MADE OF SS 410 IN RESPECT OF THE ROTATINGASSEMBLY AS PER SAMPLE AND DIRECTION OF EIC. |
| 11 | SUPPLY, DELIVERY AND FITTING-FIXING ALONG WITHNECESSARY MACHINING & FINISHING OF IMPELLER WEARRING MADE OF CF8M IN RESPECT OF THE ROTATINGASSEMBLY AS PER SAMPLE AND DIRECTION OF THE EIC. |
| 12 | DYNAMIC BALANCING OF THE ROTATING ASSEBLY OF THEPUMP INCLUDING TO & FRO TRANSPORTATION,LOADING-UNLOADING ETC AS PER DIRECTION OF THE EICAND SUBMISSION OF NECESSARY CERTIFICATE BY AREGISTERED AGENCY/SHOP. |
| 13 | LOWERING TOTAL ROTATING ASSEMBLY OF THE PUMP ANDPLACING IN PROPER POSITION ON TO THE BOTTOM CASINGOF THE PUMP |
| 14 | PLACING THE TOP COVER OF THE PUMP IN PROPER POSITION ON THE BOTTOM CASING & TIGHTENING THE NUT BOLTS AT THE JOINING POINT OF TOP & BOTTOM CASING & FITTING THE BEARING HOUSING & GLAND UNIT AT BOTH END AS PER DIRECTION OF EIC. |
| 15 | COMMISSIONING OF THE COMPLETE PUMP UNIT INCLUDINGPROPER ALIGNMENT OF THE MOTOR WITH RESPECT TO THE PUMPING UINIT AND COUPLING OF PUMP AND MOTOR UPTO THE SATISFACTION OF THE EIC. |
| 16 | TRIAL RUN OF THE PUMP ASSEMBLY FOR A PERIOD OF 24HRS TO THE SATISFACTION OF THE EIC. Please Enable Macros to View BoQ information |