| 1 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth(iii) Without pumping out water but includingshoring as required |
| 2 | Earth in filling in foundation trenches and at the back of abutments with good earth (sandy soil) in layers not exceeding 15 cm. including watering and ramming layer by layer complete with earth obtained by fresh excavation from land arranged by Department beyond 150 m. but within 300 m. including all lifts. Earth to be approved by the Engineer-in-charge. |
| 3 | Laying 150mm (approximate finished thickness) boulder soling including rough dreesing, breaking necessary hand packing and ramming down small stome pieces in the intersectices including rolling and repairing the bed of proper level camber with necessary cushionine over bed and ultimate filling of voids with moorum or sand or kiln rubbish including cost of all materials but excluding cost of boulders |
| 4 | (II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety a)1:3:6 proportion |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.(b) River bazree |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(ii ) River Bazree |
| 7 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required. |
| 8 | Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar b)15mm thick plaster |
| 10 | Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. |
| 11 | Dismantling all types of masonry excepting cementconcrete plain or reinforced, stacking serviceablematerials at site and removing rubbish as directedwithin a lead of 75 m.a) In ground floor including roof. |
| 12 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof. |
| 13 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. |
| 14 | Construction of Sub Base using Local Materials: Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method withRotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). |
| 15 | Removal of Unserviceable Soil with Disposal upto 1000 metres Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per Technical Specification Clause 302.3.11 for Rural Roads of MORD. (Mode of measurement: pre works and post works) |
| 16 | Supplying Sign Board ( 1500mmx900mm) made of M.S angle frame (50x50x6) , Sheet (0.50 mm) fitting fixing such with digging holes of dia 450 mm and depth 750 mm in allsorts of soil and repacking and consolidation the gap around the post with cement concrete (1:3:6) including priming, two coat painting & lettering both side etccomplete in all respect as per direction of the Engineer-in-charge.payment of concrete to be made separately. |
| 17 | Add GST @ 18 % |
| 18 | Add Labour Welfare Cess @ 1 % Please Enable Macros to View BoQ information |