| 1 | Excavating the soft soil, stalking for reuse near the site (max. 100โ), and clearing the site. All complete as per Architect/RCF. |
| 2 | providing and laying in position plain cement concrete of specified grade cement with trap/granite/quartzite/gneiss metal mixing in concrete mixer including bailing out water,compacting,finishing surface,curing and including the cost of centering and shuttering at al level. Mix of 1:2:4 |
| 3 | BRICK WORK: Providing and laying brick masonry of 0.23 m thickness of required height with bricks having crushing strength (35.0 kg/ sq.cm or more) in c.m. 1:4, at all levels including m.s. reinforcement of two bars of 6mm dia. Painted with anticorrosive paint at every third course properly bend and bonded at ends, fixing of holdfasts for bonding with the existing wall, raking out joints, watering, all complete as directed. |
| 4 | Providing and applying 12 mm thick internal sand faced plaster in cement mortar 1:3 at all heights and locations in one coat for masonry (except stone masonry) and concrete surfaces including racking out joints, hacking of concrete surface, watering, finishing, curing, scaffolding etc. complete. |
| 5 | Providing and applying 20 mm thick external sand faced cement plaster upto 10m from ground level and at all locations in cement mortar proportion specified below in two coats for masonry (except stone masonry) and concrete surfaces including providing water proofing compound to the first coat of plaster as per manufacturers specification, racking out joints, hacking of concrete surface, finishing, curing, scaffolding, etc complete as directed By Engineer 1:3 |
| 6 | Providing and fixing in position uPVC/SWR (Soil/Waste/Rain) pipe of type-B 75 mm dia. in any position including all fittings and accessories, making joints / connections water tight with solvent cement, scaffolding if necessary and making good the damages if any (excluding excavation and refilling the trenches) etc. complete as specified and directed.(All fittings and accessories like clamps,etc. should be of same brand. No separate payment shall be made for fittings and accessories). |
| 7 | Providing and applying first single coat of approved primer and two coats of anti-algae, anti-fungal, exterior paint as specified below of an approved make and colour as per manufacturers specifications to any surface, upto any height from ground level and at all locations as directed including preparing surfaces for painting by any approved means, watering, scaffolding, cleaning and curing etc. complete as directed by Engineer-in-charge. By using acrylic based exterior paint |
| 8 | Removal drain pipes (soil, waste, water, ventilating and rain water pipes) of any size, with all fittings. |
| 9 | Making holes in 100 mm to 150 mm dia. In brick / concrete / rubble walls for drainage pipes, fittings etc. and making good the same with C.M. 1:3 or C.C 1:2:4 and finishing on both sides with cement plaster. |
| 10 | Making holes in 230 mm to 300 mm dia. In brick / concrete / rubble walls for drainage pipes, fittings etc. and making good the same with C.M. 1:3 or C.C 1:2:4 and finishing on both sides with cement plaster. |
| 11 | Supply Of Un Skilled Labour including tools and tackles for odd and unmeasurable jobs for 8 Hrs. |
| 12 | Supply of Skilled workers including tools and tackles for odd and unmeasurable jobs for 8 Hrs. Please Enable Macros to View BoQ information |