Tender For Execution Of Work Under Mw To Conservation & Restoration Of Hemadpanthi Well At Mahalung, Talmalshiras, Dist-Solpaur (Phase-Iii). As Specified In The Boq., Solapur-Maharashtra
TDR : 54635607
Tender Notice
BOQ
8 Days Left
Solapur
Maharashtra
Tender For Execution Of Work Under Mw To Conservation & Restoration Of Hemadpanthi Well At Mahalung, Talmalshiras, Dist-Solpaur (Phase-Iii). As Specified In The Boq.
Name of Work:- Execution of work under MW to Conservation & Restoration of Hemadpanthi Well at Mahalung, TalMalshiras, Dist-Solpaur (Phase-III). As specified in the BOQ.
Sl. No.
Item Description
1
Description of works
2
The provision made for the hiring the crane(Hydra) and Fix crane as the requirement at the site wherever required at the site only the working hours consider for the hiring crane of the 10MT etc. as directed by the work incharge.
3
The provision made for the conservation and restoration of the step well the item included the scientific sorting of the ruins of and step by step carefully removal of the western side of the old UCR wall with proper skilled workers without the damage the existing structure and using with proper support system with proper care and safety measures are required to the taken and with proper screening and grading of the well back fill soil material the excavation of the western side area and the ground toward western side of the well with proper stacking the useful material within the 500mt of the step well as directed by the work in charge ,proper safety measure etc. as directed by the work incharge.
4
The provision made for the conservation of step well in basalt three line new basalt stone The provision made for restoration of step well course in new stone of step member with hand dressing and approved sample of the stones made it proper finishing as per the existing texture colour overlapping to fixing in the layers in such way that the it should be sustain with the through stone at interval to tie and locking the layers and through stone inserted in to the course of the layers and the base of the surface the through stone horizontal and vertical as per the available evidences in fine basalt stone dressing layers for corner stones box size length of 1.2m to 0.45 width 0.60m to 0.45m width thickness 180 to 330mm as per the evidences of the old corner stones fixing in the lime mortar 1:1:1 including laying placing hand dressing fixing below to ground level up to the depth of the 6m and scaffolding, curing preparing the texture as per old, matching colour of stones the basalt stone from approved quarry stone without blasting. complete as per instruction of the work incharge as per the site condition and the layer sizethe lime for etc. mortar (1Lime 1Surkhi 1sand) made with the experienced workers with adding admixtures of hirda gum jiggery with proper mixing slacking of the lime well graded river sand Surkhi, river sand and the all sample approved and basalt stone extraction of the stone from quarry without blasting the execution including fitting lifting in the well below up to 6 m including laying placing scaffolding curing etc. as directed by the work incharge. However, based on the team's assessment of the need for replacement stones during the site inspection, the decision will be made appropriately.
5
The provision made for the restoration of step well course in the new basalt stones for landing stone, corner stone with all side dressing with three line basalt stone as per old evidences and texture hand dressed as existing texture colour of the stone made with proper finishing overlapping to fixing in the layers The provision made for restoration of step well in new basalt landing stone replacing of step member with hand dressing and approved sample of the stones made it proper finishing as per the existing texture colour overlapping to fixing in the layers in such way that the it should be sustain with the through stone at interval to tie and locking the layers and through stone inserted in to the course of the layers and the base of the surface the through stone horizontal and vertical as per the available evidences in fine basalt stone dressing layers as per existing layers in three line fine basalt stones dressing layers of the various size of length1.5mt to 0.45mt width 0.45 to 0.50mt and thickness 180 to 300mm fxing the stone in the the lime mortar 1:1:1(1Lime: 1Surkhi: 1sand) made with the experienced workers with adding admixtures of hirda gum jiggery with proper mixing slacking of the lime well graded river sand Surkhi, river sand and the all sample approved and basalt stone, approved quarry, extraction of the stone from quarry without blasting for the execution including fitting lifting in the well up to 6 m including laying placing scaffolding curing etc. as directed by the work incharge. However, based on the team's assessment of the need for replacement stones during the site inspection, the decision will be made appropriately.
6
The provision made for the conservation of step well in basalt three line available basalt stone The provision made for restoration of step well course in available stone of step member with hand dressing and approved sample of the stones made it proper finishing as per the existing texture colour overlapping to fixing in the layers in such way that the it should be sustain with the through stone at interval to tie and locking the layers and through stone inserted in to the course of the layers and the base of the surface the through stone horizontal and vertical as per the available evidences in fine basalt stone dressing layers for corner stones box size length of stone 1.2 mt to 0.45m & width 0.60mt to 0.45mt and thickness 180 to 330m as per the evidences of the old corner stones fixing in the lime mortar 1:1:1 including laying placing hand dressing fixing below to ground level up to the depth of the 6m and scaffolding, curing preparing the texture as per old, matching colour of stones the basalt stone from approved quarry stone without blasting. complete as per instruction of the work incharge as per the site condition and the layer sizethe lime for etc. mortar (1Lime 1Surkhi 1sand) made with the experienced workers with adding admixtures of hirda gum jiggery with proper mixing slacking of the lime well graded river sand Surkhi, river sand and the all sample approved and basalt stone extraction of the stone from quarry without blasting the execution including fitting lifting in the well below up to 6 m including laying placing scaffolding curing etc. as directed by the work incharge.
7
The provision made for the restoration of step well course in the available basalt stones for landing stone with three line basalt stone as per old evidences and texture hand dressed as existing texture colour of the stone made with proper finishing overlapping to fixing in the layers The provision made for restoration of step well in new basalt landing stone replacing of step member with hand dressing and approved sample of the stones made it proper finishing as per the existing texture colour overlapping to fixing in the layers in such way that the it should be sustain with the through stone at interval to tie and locking the layers in to the course of the layers and the base of the surface the through stone horizontal and vertical as per the available evidences in fine basalt stone dressing layers as per existing layers in three line fine basalt stones dressing layers of the various size of length 2.1mt to 0.80mt width 0.67 to 0.7mt and thickness 180 to 300mm fixing the stone in the the lime mortar 1:1:1(1Lime: 1Surkhi: 1sand) made with the experienced workers with adding admixtures of hirda gum jiggery with proper mixing slacking of the lime well graded river sand Surkhi, river sand and the all sample approved and basalt stone, approved quarry, extraction of the stone from quarry without blasting for the execution including fitting lifting in the well up to 6 m including laying placing scaffolding curing etc. as directed by the work incharge.
8
The provision made for conservation and restoration of the inner the core filling the between surface of excavated and the stones of the step well by using available U.C.R and ancient step well in lime mortar lime 1:1:1 (1 Lime: 1 Sand:1 Surkhi) the mortar 1:1:1(1Lime: 1Surkhi: 1sand)made with the experienced workers with adding admixtures of hirda gum jiggery with proper mixing slacking of the lime well graded river sand Surkhi, river sand and the all sample approved and basalt stone for the execution including fitting lifting in the well below 4m including laying placing scaffolding curing etc. complete including carrying lifting the material and laying up to a depth of the 6m with using mechanical crane placing in position scaffolding, curing etc. as directed by the work incharge.
9
The provision made for the anchoring with stainless steel plate of the size 25 x 6mm length of 225mm both legs of the 50mm both sides with drilling and fixing with appropriate admixture and used the non-vibrating machines of the same size the work including supply of C-plate admixture drilling, fixing as etc. as directed by the work incharge.
10
GST 18% SL.No.1 to 8 Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.