| 1 | PART-A |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge. |
| 3 | All kinds of soil |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 5 | All kinds of soil |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :Make :Ultratech/Chettinad |
| 8 | 1:5:10 (1 cement : 5 fine sand derived from natural sources :10 graded stone aggregate 40 mm nominal size derived fromnatural sources) |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 10 | Foundations, footings, bases of columns, etc. for massconcrete |
| 11 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth levelMake : SAIL /JSW /TATA |
| 12 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 13 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level : |
| 14 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)Make :Ultratech/Chettinad |
| 15 | Forming groove of uniform size on plastered surface as per approved pattern using wooden battens, including removal of wooden battens, repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge : |
| 16 | 15 mm wide and 15 mm deep groove |
| 17 | Applying priming coat: |
| 18 | With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel worksMake :Asian paint /Berger |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Make :Asian paint /Berger |
| 20 | Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture |
| 21 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. |
| 22 | Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade |
| 23 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Make : SAIL /JSW /TATA/Jindal |
| 24 | Hot finished seamless type tubes |
| 25 | Removing and refixing existing poles of required size ,including all necessary materials, labour, and tools, complete as per the direction of the Engineer-in-Charge. |
| 26 | PART-B |
| 27 | Providing and fixing Kabaddi court flooring using interlocking synthetic sports mats of size 1.0 m × 1.0 m, manufactured from a mix of Japanese synthetic rubber and EVA, with a thickness of 35 mm / 37.5 mm / 40 mm. The mats shall have a density of about 125–140 kg/m² and hardness of 25–30 Shore A, with an anti-skid textured surface suitable for Kabaddi play. The flooring shall be laid in an interlocking pattern with proper edge locking and required border pieces for neat finishing, in an approved two-colour combination, complete as per specifications. Please Enable Macros to View BoQ information |