| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excludingthe cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement: 5 coarse sand: 10 graded brick aggregate 40 mm nominal size |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (3 cement: 3 coarse sand & graded stone aggregate 20 mm nominal size) |
| 4 | Providing & laying damp proof Course 40 mm thick with cement concrete 1:2:4 (1 cement 2 cearte sand: 4 graded stone agg 12.5 mm nominal size) and curing complete |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including eduing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate |
| 6 | Steel reinforcement for R.C.C. work including binding all complete upto plinth level Cold twisted bars straightening, cutting, bending, placing in position and |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: |
| 8 | Foundations, footings, bases of columns etc, for mass concrete. |
| 9 | Suspended floors, roofs, landings, balconies and access platforms |
| 10 | edges of slab |
| 11 | carriage of material |
| 12 | sand for an average distance of 10Km |
| 13 | Stone agg for an average distance of 10 Km |
| 14 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m Please Enable Macros to View BoQ information |