Name of Work:- Const. of Steel Bridge at Bali Garathwali Nalhi. Pyt. - Chicha, Block - Nagseni, Distt. Kishtwar
Sl. No.
Item Description
1
Design , Construction and commissioning of 20MTR SPAN FOOT BRIDGE (1.80 meter wide) on EPC MODE (ENGINEERING PROCUREMENT AND CONSTRUCTION MODE). The job among other things include design to be Vetted by IIT /NIT/DIQC under proper covering letter with seal and signature including soil investigation, construction of Sub- tructure, super-structure, providing Drainage spouts, Providing & Fixing of suitable bearings as per approved / vetted design , P/F of Bridge & approach side railings (as per approved drawings) incl. construction of approaches of required length (as per approved/vetted design , as per the directions of Engineer In charge) on each side, painting of bridge superstructure (as per the directions of Engineer In charge) ,including carriages of all items & any other item necessarily to be executed for the commissioning of the bridge including charges for safety audit through DIQC . (Complete Job in all respects). The cost shall include GST @18% and all other taxes applicable at the time of payment). @120000 Per Running Meter Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.