|
| 1 | Hire charges of Hyduralic excavator capicity of 1 cum bucket for emergency work during floods ( JCB) including fuel charges. |
| 2 | Providing of Sumo Taveera to be hiried during floods / Heavy rains including cost of fuel etc for working hours and when needed for inspection of vulnerable spots including cost of POL and other allied charges etc As per (LMR) |
| 3 | Hiring of tractor for emergency works during floods /heavy rains as and when requried including cost of fuel and other allied charges etc as per (LMR) |
| 4 | Supply and stacking of good earth during floods ,heavy rains and when required including all leads and lifts and machanical carriages upto dumping site with loading unloading ( 5km MT) |
| 5 | Filling of EC bags with sand / Earth / stone dust including cost of strings/swings excluding cost of EC bags , sand and earth. |
| 6 | Placing of sand / earth / stone / dust filled EC bags in dry condition |
| 7 | Placing of sand / earth / stone dust filled EC bags in Wet condition |
| 8 | Carriage of EC bags from source to dumping site including loading, unloading, stacking etc complete job ( 15km avg MT). |
| 9 | Labour charges for unskilled labourers for sheduled working hours as and when needed during emergency (LMR) |
| 10 | Loading /Unloading sand/ earth filled stone dust filled bags, in lorries lead upto 50 mts. |
| 11 | Capturing Geotagged photographs ,editing and printing hard copies (before, during and after execution ) of vulnerable spots |
| 12 | Supply of EC bags including all carriage from dumping site to actual site of work |
| 13 | Engagement of pokelean for emergency works during floods or heavy rains as and when needed including operational and fuel charges for working hours involved as per LMR |
| 14 | Slip Clearance in soils:; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. |
| 15 | Supply of 4'' x 4'' mesh 16' x16 ' size B.A wire knitted crates made of 4 mm dia wire including all carriage |
| 16 | Supply of Nallah stone including GST 18% + C.P |
| 17 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 18 | Carriage of stone materials from source to site of work /road site 08km ( for actual carriage distance the j&k schedule rates shall be adjusted based on contractor qouted rates ). |
| 19 | Extra carriage of stone materials from road site to site of work 50m . (For actual head load distance the j&k schedule rates shall be adjusted based on contractor qouted rates). |
| 20 | Providing and supply of black ploythene 255 micron standred size and quality 200 GSM of approved brand and color |
| 21 | Hire charges of dewatering pump set of capacity of 4000 ltr/hour including cost of service of opreating staff , GST, supply of lubricating oil and diesel and other mantainance charges complete job |
| 22 | Supply of heavy duty, rope of standard size and quality Please Enable Macros to View BoQ information |