|
| 1 | Chairs of sorts |
| 2 | I) Replacement of wooden items of hard wood of require size /shape to chairs of sorts duly polished |
| 3 | a) Wooden legs |
| 4 | b) Wooden Arms |
| 5 | c) Wooden back frame |
| 6 | d) Wooden seat frame |
| 7 | ii) Routine carpentry repairs of chairs by way of fixing of nails, fevicol and easement of chairs |
| 8 | Beds of sort/Day beds |
| 9 | a) Replacement of hard wood rails/centre supports of required size/shape i/e cost of hard wood and all fixing materials duly fixed/spirit polishing. |
| 10 | i) 1 ½ ‘’x1 ½ ‘’ |
| 11 | ii) 1 ½ ‘’x2 ‘’ |
| 12 | iii) 1 ½ ‘’x3‘’ |
| 13 | iv) 1 ½ ‘’x4‘’ |
| 14 | b) Pro/fixing of teak wood to beds of sorts i.e. cost of teak wood and other fixing materialetc. |
| 15 | c) Pro/fix of bed joints |
| 16 | d) Routine carpentry repairs of beds by way of fixing of nails, nuts, bolts, fevicol and easement of beds |
| 17 | Centre Tables/Teapoys/peg tables/Bed side tables: |
| 18 | a) Replacement of following & fixing of new items Duly spirit polished and i.e. cost of all material |
| 19 | Wooden legs |
| 20 | Wooden rails |
| 21 | Wooden support under top |
| 22 | b) Pro/fixing of glass panes i/c cost of all material and fixing charges with moulding |
| 23 | i) 5mm black glass top |
| 24 | ii) 8mm tinted glass top |
| 25 | iii) 8mm plain glass top |
| 26 | iv) 10 mm tinted glass top |
| 27 | v) 10mm plain glass top |
| 28 | vi) 12mm Tinted glass top |
| 29 | vii) 12mm Plain glass top |
| 30 | c] Routine carpentry repairs of centre tables, teapoy, pegtable/bedsides tables by way of fixing of nails, fevicol and easement of tables. |
| 31 | Dressing tables of sorts |
| 32 | a) Providing/fixing of wooden legs |
| 33 | b) Providing/fixing of wooden frame under mirror |
| 34 | c) Providing/fixing of plywood to back mirror frame |
| 35 | d) Providing/fixing of mirror fitted with clips of Required size |
| 36 | f) Providing/fixing of knobs |
| 37 | g) Providing/fixing of hinges |
| 38 | Office tables of sorts/Computer tables |
| 39 | a Providing/fixing of knobs |
| 40 | b) Providing/fixing of hinges |
| 41 | c) Providing/fixing of link locks |
| 42 | d) Providing/fixing of computer channels |
| 43 | e) Providing/fixing of handles for tables Complete Job |
| 44 | i) 2’’ |
| 45 | ii) 3’’ |
| 46 | iii) 4’’ |
| 47 | iv) 5’’ |
| 48 | h] Routine carpentry repairs of office tables/computer tablesby way of fixing of nails, fevicol and easement of office tables, computer tables |
| 49 | 6. Replacement of door/window canopies |
| 50 | a. Re-fixing of new (window/door)canopies including all fixing materials, acrylic fabric, dickson frame and astro arm (complete job) |
| 51 | 7. Pro/Fix of block board/plywood of superior quality to the Beds/Chairs of sorts/Centre Tables/Peg tables/Teapoy/ Bed side table/Dressing table/Office table & Computer table and other required materials |
| 52 | i.) 4 mm |
| 53 | ii.) 6 mm |
| 54 | iii.) 12 mm |
| 55 | iv.) 19 mm |
| 56 | 8. Replacement of damaged sunmaica top with sunmaica of required thickness duly fixed to Beds/Chairs of sorts/Centre Tables/Peg tables/ Teapoy/Bed side table/Dressing table/Office table & Computer tables withfevicol and other required materials i.e.cost of sunmaica and other materials |
| 57 | 9. Pro/fix of first class plain beading to outer edges of beds/tables i.e. cost of fixing material /fixing charges |
| 58 | i) ½\\" |
| 59 | ii) ¾\\" |
| 60 | iii) 1\\" |
| 61 | iv) 1½\\" |
| 62 | v) 2\\" |
| 63 | 10. Supply and fixing of: |
| 64 | a) Curtain rods ¾\\" |
| 65 | b) 1\\" |
| 66 | c) Curtain rods fancy type sup.quality¾\\" |
| 67 | d) Curtain rods fancy type sup.quality1\\" |
| 68 | e) Brackets fancy type sup.quality |
| 69 | 11. Refixing of old furnishing items Complete Job |
| 70 | a. Plain/Dotted |
| 71 | b. Printed |
| 72 | c. Loopile |
| 73 | d. Designed furnishing |
| 74 | e. Unitex flooring |
| 75 | f. Versaline flooring |
| 76 | g. Thermacool |
| 77 | 12. Stitching charges of Special type door and Window curtains, including cost of all fixing Material with ironing (complete job) |
| 78 | With Lining (ring type) |
| 79 | Without Lining (ring type) |
| 80 | 13. Stitching charges of Special type door and Crewal curtains, including cost of all fixing Material with ironing (complete job). |
| 81 | With Lining (ring type) |
| 82 | Without Lining (ring type) |
| 83 | 14. Stitching charges of Special type door and window curtains, including cost of all fixing material with ironing (complete job). |
| 84 | With Lining (pleated) |
| 85 | Without Lining (pleated) |
| 86 | 15. Stitching charges of plain type door / window curtains including cost of fixing material with ironing. |
| 87 | (With lining) |
| 88 | (Without lining) |
| 89 | 16. Stitching charges of net curtains door / window curtains including cost of fixing material with ironing |
| 90 | (Plain) |
| 91 | (Ring type) |
| 92 | Important NOTE:-The basic principles to be followed in case of repair work shall be as:-1. The rate contract for repair work shall not be splitted between two or more bidders so as to avoid possible inconvenience to the department.2. The bidder who will qualify for maximum items shall be awarded the rate contract subject to the condition that he may accept the lowest rate of other items offered by any other bidder.3. The tactics of Pool/Cartel formation which is against the basic principles of competitive bidding is an offence under the competition (amendment) Act 2007. In case of any evidence of Pool/cartel formation suitable action as warranted under rules shall be resorted to, and shall lead to rejection of bid. Please Enable Macros to View BoQ information |