Name of Work:- Construction of drain from house of Mohd Yousuf Malla to land of Abdul Rashid at sheikhpora
Sl. No.
Item Description
1
Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Rural Engineering Wing Budgam Name of work :- Construction of drain from house of Mohd Yousuf Malla to land of Abdul Rashid at sheikhpora Scheme: PRI Contract No: of 2025-26 DATED: Adv cost = Rs 2.94135 Lacs Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S.No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2
Earthwork in excavation in foundation trenches lead 1 m lift 1.5 m
3
P/L stone soling hand packed on level incl ramming with heavy rammers
4
P/L in position cement concrete of specified grade excluding the cost of shuttering and centering finishing and reinforcement all work upto plinth level M10 grade(1:3:6 ) with 20mm aggregate
5
Centring and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columns Foundation and footing bases of column
6
Felling of trees of the girth measured at a height of 1 m above ground level incl cutting of trunk and branches etc 60-120 cms
7
12mm thick cement plaster of mix 1:6
8
Stone aggregate & Sand (Avg lead 12 Km)
9
Solling Stone (Avg lead 12 Km)
10
Provision of sign board and Photographs, and unforseen items , dewatering etc Total in Figures Excess(+) 1.0 Full Conversion INR 294000.0 294000.0 INR Two Lakh Ninety Four Thousand Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.