|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 9 | Foundations, footings, bases of columns etc. for mass concrete. |
| 10 | Suspended floors, roofs, landings, balconies and access platforms. |
| 11 | Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 12 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 13 | Disposal of building rubbish / mulba for an average lead of 10Km by Mechanical means outside the municipal limit. |
| 14 | Carriage of Material including loading / unloading by Mechanical Transport. |
| 15 | Dust/Stone Aggregate below 20mm for an average lead 10Km by MT |
| 16 | Stone Aggregate 40mm and above for an average lead 10Km by MT Please Enable Macros to View BoQ information |