|
| 1 | Earh work in excavation by manual means over areas ( exceeding 30 cm and up to 1.5 mtr in width and 1.5 mtr in depth as well as 10 sqm on plan ) incl. disposal of excavated earth up to 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in AKS |
| 2 | Dry boulder stone Pitching/soling on horizontal surfaces |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). |
| 4 | Boulders |
| 5 | Random Rubble Masonary with hard stone from nallah in foundation and plinth incl levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand :12 stone agg 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement :6 Coarse sand) |
| 6 | Extra for RRM with hard stone in superstructure above plinth level and upto floor level. |
| 7 | Providing and laying in position Reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 40 mm nominal size) in suspended roofs, balconies, landings and stair cases, roofs having slope upto 15 upto floor V Level including curing but excluding the cost of centring and shuttering. |
| 8 | Steel Reinforcement for RCC work including cutting, bending, binding and placing in position all complete (TMT bars of Fe500 Grade) |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations , plinth, footing bases of columns etc for mass concrete. |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for:Edges of slabs and breaks in floors and walls 20 cm wide |
| 12 | 15 mm thick cement plaster of mix 1:4 (1 cement: 4 fine sand) |
| 13 | 12 mm thick cement Plaster of mix 1:4 (1 cement :4 fine sand) |
| 14 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.40mm thick with 20 mm nominal size stone aggregate. |
| 15 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade. Two or more coats on new work. |
| 16 | Providing and fixing of vertified floor tiles in different sizes (600x600) |
| 17 | Providing and fixing of ceramic wall tiles (300x450) |
| 18 | Provision for Door/Ventilator |
| 19 | Provision for water tank/WC Gi pipes etc |
| 20 | Carriage of Cement from source to site by mechanical transport or animal transport or by head load |
| 21 | Carriage of Sand from source to site by mechanical transport or animal transport or by head load |
| 22 | Carriage of Stone Aggregates from source to site by mechanical transport or animal transport or by head load |
| 23 | Carriage of stones from source to site by mechanical transport or animal transport or by head load |
| 24 | CIB( citizen information board of Granite Stone) ( complete job) Please Enable Macros to View BoQ information |